Laserfiche WebLink
1. Construction Inspection <br />The Owner has provided the City with Exhibits A and B, which depict drawings of the <br />reconstructed Intersection and the Dedicated Improvements, which the City acknowledges <br />conforms to the City's standards. The Owner shall allow the City to inspect the Intersection and <br />Dedicated Improvements during construction to ensure conformance to the agreed standards set <br />forth in Exhibits A and B, in particular with regard to area planning, adequacy of design, and <br />quality of construction. The Owner shall contact the City to arrange for the attendance of a City <br />inspector at key milestones throughout work within the R.O.W. Key milestones shall include but <br />not limited to: Storm Sewer installation, No. 53 stone placement, Hot Mixed Asphalt placement, <br />and concrete curb or sidewalk placement. The Owner agrees to perform any necessary <br />adjustments as reasonably required by the City as a result of such inspections. <br />2. Permits <br />It shall be Owner's sole responsibility and expense to obtain all permits associated with <br />the construction and installation of the reconstructed Intersection and the Dedicated <br />Improvements in the R.O.W. <br />3. Performance Bond <br />Owner agrees to provide the City with a performance bond for an amount equal to one <br />hundred twenty—five percent (125%) of the construction cost covering all work performed <br />pursuant to this Agreement. <br />4. Maintenance Bond <br />Owner agrees to provide the City with a maintenance bond equal to ten percent (10%) of <br />the construction cost covering all work performed pursuant to this Agreement, and such bond <br />shall remain in effect for three (3) years after dedication as described in Section 6 below. <br />