Laserfiche WebLink
QUOTE/PROPOSAL CITY OF SOUTH BEND <br />PROJECT NAME: Edison Production Well #2A Rehabilitation <br />PROJECT NO. Zle, r`o 3 <br />QUOTES DUE November 13, 2018, 9:30 AM <br />BASE QUOTE <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />Step drawdown test <br />1 <br />LS <br />$550.00 <br />$ 550.00 <br />2 <br />.m_.....____.. <br />Well Cleaning and Redevelopment <br />1 <br />LS <br />$21,400.00 <br />$ 21,400.00 <br />3 <br />Pre-& Post Cleaning Video Inspection <br />1 <br />LS <br />$810.00 <br />$ 810.00 <br />of Casing and Screen <br />4 <br />Disassembling and reassembling <br />1 <br />LS <br />$330.00 <br />$ 330.00 <br />related to inspection of pump and driver <br />._. ........ <br />New Driver/Motor Premium Efficient <br />5 <br />Inverter Duty Unit. US Motor Brand <br />1 <br />LS <br />$9,775.00 <br />$ 9,775.00 <br />125HP <_142Amps <br />Winding <br />Frame: 40OTP Part Winding Start <br />_..._w <br />2 stage 14FKH Flow Pump <br />............... <br />6 <br />Replacement or equal must conform to <br />1 <br />LS <br />$8,650.00 <br />$ 8,650.00 <br />Hydraulic Institute HI 14.6 Grade 1 U <br />Replacement S40 Column Pipe: Pipe <br />7 <br />size 12" 10-foot sections: Flanged <br />1 <br />LS <br />$1,780.00 <br />$ 1,780.00 <br />13 <br />......... ....... ..... <br />Replacement S40 Column Pipe: Pipe <br />1 <br />LS <br />$732.00 <br />$ 732.00 <br />size 12" 10-foot sections: Coupled <br />Replacement S40 Column Pipe: Pipe <br />��m��.......... <br />9 <br />size 12" 5-foot sections: Flanged <br />1 <br />LS <br />$1,352.00 <br />$ 1,352.00 <br />10 <br />Replacement S40 Column Pipe: Pipe <br />1 <br />LS <br />$493.00 <br />$ 493.00 <br />size 12" 5-foot sections: Coupled <br />Replacement Suction Pipe: Pipe size <br />11 <br />12" 10-foot sections <br />1 <br />LS <br />$619.00 <br />$ 619.00 <br />Replacement CS Column Line Shaft <br />12 <br />10-Foot: Shaft Size: 1-15/16° <br />1 <br />LS <br />$232.00 <br />$ 232.00 <br />13 <br />......... .............. <br />Replacement CS Column Line Shaft <br />1 <br />LS <br />$178.00 <br />$ 178.00 <br />5-Foot: Shaft Size: 1-15/16' <br />.. <br />Shop / Refurbishment <br />. <br />......... _ ................ <br />12 <br />Hourly Labor Rate <br />1 <br />LS <br />$90.00 <br />$ 90.00 <br />Miscellaneous Well Components: <br />13 <br />reconditioning/replacement <br />1 <br />LS <br />ALLOWANCE <br />$3,000.00 <br />Version 10/31/2017 Page - 16 Public Works Quote <br />