South Bend Redevelopment Commission <br /> Regular Meeting—April 24, 2012 <br /> In 2007, the Board of Public Works entered <br /> into a contract with DLZ to prepare Design <br /> and Right of Way Engineering for <br /> improvements to Olive Road from <br /> Lincolnway West to Nimtz (Phase 1) and <br /> from Edison to Lincolnway West (Phase 2). <br /> The budget for the design of Phase 1 was <br /> $502,900 and the budget for the design of <br /> Phase 2 was $303,750. Due to changes in <br /> work scope, the work on Phase 2 was started <br /> but eventually held for a future point and the <br /> funds that were approved for use were <br /> reprogrammed within the project to be used <br /> for Right-of-Way acquisition services for the <br /> roadway. <br /> The purpose of Supplement#3 is to add <br /> $35,000 to the project budget to complete <br /> some design and right of way engineering for <br /> the section of roadway that connects Olive <br /> Road to Pine Road at the intersection with <br /> Lincolnway West. The St. Joseph County <br /> Airport Authority is underway with <br /> acquisition of a tract of land that would <br /> allow, with the City's purchase of one parcel, <br /> to construct the connector roadway necessary <br /> to link this roadway network. With this work <br /> complete, a continuous roadway corridor can <br /> be developed from Adams Road to Western <br /> Avenue/SR 2. These additional funds will <br /> help finalize plans through the future airport <br /> property and complete some intersection <br /> redesign at Lincolnway West. <br /> Supplement #3—there is some initial <br /> planning just to get Olive Road,which <br /> now runs from Lincolnway up to Brick. <br /> Eventually we'd like to get this corridor all <br /> the way from Western Avenue on the <br /> south, State Road 2, all the way up to <br /> Adams Road which really opens this area <br /> up to a great development area on the west <br /> 24 <br />