My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-24-12 Redevelopment Commission Minutes
sbend
>
Public
>
Redevelopment Commission
>
Minutes
>
2010-2019
>
2012
>
04-24-12 Redevelopment Commission Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2012 10:00:37 AM
Creation date
5/11/2012 10:00:22 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
South Bend Redevelopment Commission <br /> Regular Meeting—April 24, 2012 <br /> Olive Road improvements, north of <br /> Lincolnway to Nimtz Parkway and the <br /> third dealing with the Olive Road <br /> connector south of Lincolnway. A map <br /> was passed out that Mr. Schalliol had done <br /> prior to this meeting that explains what <br /> Supplement #1, #2 and #3 do. Supplement <br /> #1 has to do with the design and plans for <br /> the improvements north of Lincolnway, <br /> basically at the corner of Olive Road and <br /> Nimtz Parkway. As part of the Olive <br /> Road project, there needs to be certain <br /> retention basins along the stretch of road. <br /> This one here, in particular, there's an <br /> existing retention basin in the blue <br /> rectangular area. What this does is <br /> expand on the existing basin to allow <br /> drainage. Right now that basin was built <br /> for a capacity of north of Nimtz/Olive <br /> Road in that area to accommodate <br /> additional water flow into it along the <br /> improved Olive Road. Where the <br /> Supplement #2 box is, there is a hill there, <br /> so this would feed into the basin north of <br /> the hill, thus the road is improved. So <br /> Supplement #1 basically is a contract for <br /> $14,000 to design and plan for that <br /> improved and expanded retention basin. <br /> The second supplement deals with the <br /> actual building, or expanding of the <br /> retention basin as part of the right-of-way <br /> acquisition. Right on the corner there is <br /> the Lutheran Academy, if you will. <br /> Working with them to gain what the green <br /> line there is, is sewer easement that we <br /> needed to get from the academy to run <br /> from the guttering and the catch basin at <br /> the bottom of the hill there to run it into <br /> the new expanded basin. This supplement <br /> #2 basically sets the budget for that work. <br /> The engineers estimate was about <br /> $110,000 and we're asking for not-to- <br /> 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.