Laserfiche WebLink
LUTHERAN SCHOOL - SOCCER FIELDS <br />STATEMENT OF PROBABLE CONSTRUCTION COSTS <br />December 21, 2011 <br />M.\PRO7\076l\266,LPhase I \civil \eng \[Cost Estimate (Lutheran School) 8- 30- 2011.x1s]COST ESTIMATE <br />Itsase isia <br />CONSTRUCTION ENGINEERING <br />1 <br />LS <br />$ 2,000.00 <br />$ 2,000.00 <br />COMMON EXCAVATION <br />3,050 <br />CYS <br />$ 700 <br />$ 21,350.00 <br />TOPSOIL <br />920 <br />CYS <br />$ 5.00 <br />$ 4,600.00 <br />BASIN SEEDING <br />4,835 <br />SYS <br />$ 2.50 <br />$ 12,087.50 <br />GEOTEXTILE <br />285 <br />SYS <br />$ 1.50 <br />$ 427.50 <br />MOD. MANHOLE, TYPE K4 <br />4 <br />EACH <br />$ 2,000.00 <br />$ 8,000.00 <br />CONTINGENCY <br />1 <br />LS <br />$ 5,200.00 <br />$ 5,200.00 <br />2011 Base Bid TOTAL <br />s 109,975.00 <br />M.\PRO7\076l\266,LPhase I \civil \eng \[Cost Estimate (Lutheran School) 8- 30- 2011.x1s]COST ESTIMATE <br />