My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6C (7)
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2012
>
04-24-12 Packet
>
6C (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2012 10:27:14 AM
Creation date
4/20/2012 12:33:16 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Geri Hathaway <br />06 July 2011 <br />Page 2 of 2 <br />For the infrastructure design outlined above, BSA LifeStructures would propose the following fee: <br />Civil Engineering $114,000 <br />Permitting (labor to obtain permits) $ 7,000 <br />Reimbursable Allowance (travel and other standard reimbursables)* 7,000 <br />Total Fee (maximum) <br />$128,000 <br />*Reimbursables will be billed as part of the base fee uo to the $7,000 maximum. This amount does <br />not include the actual cost of requiredpermits <br />If the above - referenced fee is acceptable for the work outlined, BSA LifeStructures will require an <br />executed letter agreement, which will be sent after all parties agree to the scope and fee, prior to <br />commencement of work. We would like to thank you for this opportunity to assist your <br />organization in igniting life sciences growth in downtown South Bend and look forward to working <br />with you in the future. Thanks again. <br />Sincerely, <br />1 •�4 � <br />Chris W. Lake, AIA, LEED AP <br />Principal -in- Charge <br />APPROVED <br />South Bend <br />�l:�l)l�l!� • <br />
The URL can be used to link to this page
Your browser does not support the video tag.