My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-27-12 Redevelopment Commission Minutes
sbend
>
Public
>
Redevelopment Commission
>
Minutes
>
2010-2019
>
2012
>
03-27-12 Redevelopment Commission Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2012 2:36:28 PM
Creation date
4/12/2012 2:36:15 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
South Bend Redevelopment Commission <br /> Regular Meeting—March 27, 2012 <br /> 6. NEW BUSINESS (CONT.) <br /> D. South Side Development Area <br /> (1) continued... <br /> Golf Course area. Improvement projects like <br /> the Erskine Plaza Pond project, proposed <br /> improvements to the intersection of Ireland - <br /> High, and the proposed Fellows-Chippewa <br /> connector project all create opportunities to <br /> improve the drainage and traffic circulation <br /> around the course. <br /> As part of both the proposed Fellows- <br /> Chippewa project and the proposed Ireland - <br /> High intersection project, there are <br /> opportunities to improve surface and <br /> overflow drainage that flows into the golf <br /> course area and reduce course flooding and <br /> damage as well as reduce the drainage <br /> feature costs associated with both of the <br /> proposed infrastructure projects. The <br /> opportunity to develop connected pond <br /> systems on the course can reduce the costs <br /> associated with pipe work and storm line <br /> constraints on the south side storm water <br /> network. <br /> The attached proposal contemplates survey <br /> services in two formats: <br /> Option 1. Survey services via aerial <br /> photography - $18,769 <br /> Option 2. Survey services via land <br /> based survey - $21,016 <br /> Staff would request approval of a budget cap <br /> of$22,000 for survey services with an <br /> overage allowance for Option 2 based on <br /> estimated costs for potential overage costs <br /> based on the amount of area to be surveyed. <br /> 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.