Laserfiche WebLink
PUBLIC AGENDA SESSION <br />no <br />Base Bid <br />$543,394.28 <br />Alternate i <br />Location <br />Item 31A <br />$4,590.00 <br />Item 35A <br />$20,413.90 <br />Total Alt. 1 <br />$16,900.00 <br />Alternate 2 <br />MDA Muscle <br />Item 43 <br />$3,500.00 <br />MARCH 22, 2012 96 <br />SELGE CONSTRUCTION CO. INC. <br />2833 South IIt Street <br />Niles, Michigan 49120 <br />Bid was signed by: Mr. James Boyles <br />1. Contractor's Non - Collusion Affidavit, Non - Debarment Affidavit, Employment <br />Eligibility Verification, Non - Discrimination Commitment for Contractors and <br />Certification of Use of United States Steel Products or Foundry Products was <br />Submitted <br />2. Five percent (5 %) Bid Bond was submitted <br />3. Indiana Local Business Preference Claim Form was submitted <br />003 <br />Base Bid <br />$5538,110.45 <br />Alternate 1 <br />Location <br />Item 31A <br />$6,918.75 <br />Item 35A <br />$26,650.00 <br />Total Alt. 1 <br />$33,568.75 <br />Alternate 2 <br />MDA Muscle <br />Item 43 <br />$7,000.00 <br />It was noted that John Boettcher Sewer & Excavating did not include the correct Contractor's <br />.......... <br />Non - Collusion Affidavit, Non - Debarment Affidavit, Employment Eligibility Verification, Non- <br />Discrimination Commitment for Contractors and Certification of Use of United States Steel <br />Products or Foundry Products form with their bid. The Clerk was instructed to notify them of <br />this discrepancy and let them know that they need to submit the form within 24 hours. Upon a <br />motion made by Mr. Gilot, seconded by Mr. Inks and carried, the above bids were referred to <br />Engineering for review and recommendation, <br />AWARD BID AND APPROVE CONTRACT — DIAMOND AVENUE TRUNK STORM <br />SEWER BID PACKAGE 2 — PROJECT NO, 109 -033B 2011 SEWER BOND <br />Mr. John Engstrom, Engineering, advised the Board that on February 28, 2012, bids were <br />received and opened for the above referenced project. After reviewing those bids, Mr. <br />Engstrom recommended that the Board award the contract to the lowest responsive and <br />responsible bidder HRP Construction, PO Box 266, South Bend, Indiana 46624, in the amount <br />of $3,522,025.00 (Base Bid Only). Therefore, Mr. Gilot made a motion that the <br />recommendation be accepted and the bid be awarded and the Construction Contract approved <br />as outlined above. Mr. Inks seconded the motion, which carried. <br />APPROVAL OF PROCESSION <br />The following procession was presented for approval: <br />Applicant <br />Description <br />Date /Time <br />Location <br />Motion <br />Muscular <br />Procession — <br />March —24,2012, <br />No Police or Traffic <br />Carried <br />Inks /Gilot <br />Dystrophy <br />MDA Muscle <br />12:00 p.m. to <br />Assistance; Must Stay on <br />Subject to <br />Association <br />Walk <br />2:30 p.m. <br />Sidewalks. <br />Certificate of <br />Insurance <br />Board members discussed the following item(s) from the agenda. <br />- Request to Advertise for Bids — Memorial Hospital Facade Project <br />