My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6C (6)
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2012
>
04-10-12 Packet
>
6C (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2012 10:35:24 AM
Creation date
4/5/2012 12:23:47 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
March 7, 2012 <br />Proposal for Planning Study <br />Mayflower Connector Bridge <br />South Bend, Indiana <br />TASK #2 PRELIMINARY TRANSPORTATION ANALYSIS <br />Page 2 <br />This task will consist of the study of the impacts to traffic patterns in the region as a result <br />of the Mayflower interconnect concept. We will assess mobility in, around, and through <br />the study area, including opportunities for restricted access for the ITR. This will include <br />several meetings with the City and the ITR Concession Company. This is not a detailed <br />Traffic Impact Study, which may or may not be required as part of final project <br />approvals. <br />TASK #3 CONCEPTUAL ROADWAY /BRIDGE DESIGN <br />This task will include the development of a conceptual design of the roadway and <br />bridge structure, including a detailed review of the geometric requirements of all the <br />road /highway components. This will also include a preliminary bridge structure size and <br />type selection. <br />TASK #4 LAND USE CONCEPTS <br />This task will include the development of schematic land use concepts, based upon the <br />conceptual roadway design, to assist with the analysis of potential benefits of the <br />implementing the interconnect concept. <br />Stakeholder Meetings / Consensus Building <br />Keys to the formulation of useful schematic designs are the discussions between the <br />City and key stakeholders. Key stakeholders include land owners in the study area, the <br />City, the ITR Concession Company, etc. We will meet with these stakeholders to gather <br />input and feedback. <br />Additional meetings may be held as needed and /or as identified by client, not <br />included in this proposal. <br />TASK #5 PROJECT COSTS ANALYSIS <br />This task will consist of the preparation of estimate total project costs to implement the <br />interconnect concept. <br />TASK #6 IMPLEMENTATION PROCESS AND SCHEDULE <br />This task will consist of the preparation of an outline of the approval process and <br />timeline to implement the interconnect concept. We will also prepare a report which <br />will include all of the findings and results of this study. <br />Engineers Architects Planners Surveyors <br />
The URL can be used to link to this page
Your browser does not support the video tag.