Laserfiche WebLink
Service Invoice <br />BOB FRAME PLUMBING SERVICES, INC. <br />2442 JACLYN COURT <br />SOUTH BEND, IN 46614-3700 <br />Phone: (574)291-7511 Fax: (574)299-1297'Gd <br />ML1 <br />2018 <br />Billed Customer: #019369 ^° 04 <br />9N uce"99 NO. PCU700"0 <br />PLUMBING SERVICES <br />Pagel of 2 <br />VPA-CENTURY CENTER N m x p p Po a a w...... ........ CENTURY CENTER <br />SCOTT SCOTT <br />120 S. DR MARTIN LUTHER KING JR BLV 120 S. DR MARTIN LUTHER KING JR BLV <br />SOUTH BEND, IN 46601 SOUTH BEND, IN 46601 <br />55380 8/23/2018 S-55380 08/23/2018 Amount Paid <br />CallSlip Number Invoice Date Invoice Number Due Date Contractor's License # <br />55380 8/23/2018 S-55380 08/23/2018 PC887700840 <br />LABOR, MATERIAL & EQUIPMENT TO REPAIR 6" STORM LINE. <br />8/16/18 CUT PIECE OF 6" CAST IRON OUT. USED THE PUSH CAMERA TO TELEVISE STORM LINE 20 FT. <br />OUT THE LINE IS BROKEN. WILL NEED TO RETURN TO TROUBLE SHOOT FURTHER INTO THE BREAK. <br />8/20/18 TRIED TO CLEAN THE 6" STORM DRAIN WITH THE SEWER MACHINE; THE CABLE KEPT SCREWING OUT <br />INTO THE DIRT. TELEVISED AND LINE IS BROKEN WITH VOID. LOCATED THE AREA AGAIN. LARGE RAIN <br />STORM WAS MOVING IN. TALKED TO SCOTT AND DECIDED TO TRY AND DIVERT SOME OF THE WATER TO <br />RELIEVE THE PRESSURE UNDER THE FLOOR. RAN 160 FT. OF 6" PIPE OVER TO THE CRAWL SPACE THAT <br />LEADS TO THE RIVER. <br />8/22/18 USED THE ELECTRIC PARTNER SAW TO WET CUT THE FLOOR. USED THE JACK HAMMER TO REMOVE <br />THE CONCRETE. HAND DUG DOWN TO THE 6" STORM LINE AND REPAIRED THE BROKEN SECTION. BACKFILLED <br />THE HOLE. TELEVISED THE REST OF THE STORM LINE. THE LINE IS OPEN AND FLOWING. <br />8/2.3/1-8 FINISHED BACK FILLING HOLE IN THE BATHROOM <br />CLEANED UP THE AREA. <br />MATERIAL <br />(1) 6 X 6 NO HUB <br />(1) DIABLO BLADE <br />(160')6" SCH 40 PVC PIPE <br />(1) 6" SCH 40 PVC TEE <br />(9) 6" SCH 40 PVC 45 <br />(3) 6" SCH 40 PVC ST. 45 <br />(3) 6" SCH 40 PVC COUP. <br />(1) 6" SCH 40 MALE ADAPT. <br />(1) 6" HUSKY BAND CLAMP <br />(1) PACKAGE DTABLO SAW BLADES <br />(2) 3/4 X 10 GALV. BAND IRON <br />(1) PACKAGE TAPCONS <br />(1) PACKAGE FENDE-WASHER <br />(3) 6" SCH 40 PVC 90 <br />6" LAY FLAT HOSE WITH 6" FITTINGS <br />(2) 6" PL X 6" CLAY SHIELDED FERNCOS <br />(2) 4" PL X 4" PL SHIELDED FERNCOS <br />(10) 6" SCH 40 PVC PIPE <br />(10) 4" SCH 40 PIPE <br />(2) ROLLS VISQUEEN <br />(2) 6" NO HUB BANDS <br />(1) CRUSHED CEMENT <br />REMOVED TEMP. 6" PIPE AND HAULED AWAY; <br />20.80 <br />13.28 <br />347.04 <br />38.87 <br />211.68 Undor Number, <br />71.58 <br />56.76 Approvals <br />16.44 PO <br />61.62 <br />66.36 (iT-, ACct <br />4.98 <br />28.36 Amount <br />12.90 Date Entered <br />91.21 9-itc o` Chcck Ck # <br />1152.38 <br />78.00 <br />46.80 <br />50.10 AITUOV r. <br />25.40 of Public NVorkq <br />93.50 <br />41.60 <br />