My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Services Agreement - Lochmueller Group Inc - Construction Inspection Services for Howard Park Redevelopment
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Agreements, Contracts, Proposals
>
Professional Services Agreement - Lochmueller Group Inc - Construction Inspection Services for Howard Park Redevelopment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 9:42:24 AM
Creation date
11/14/2018 1:15:00 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
11/13/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
and advise Engineer of that part of work in progress that RPR believes should be <br />corrected or rejected or should be uncovered for observation, or requires special testing, <br />inspection, or approval. <br />9. Inspections, Tests, and System Start-ups: <br />a. Consult with Engineer in advance of scheduled inspections, tests, and systems start-ups. <br />b. Verify that tests, equipment, and systems start-ups and operating and maintenance <br />training are conducted in the presence of appropriate Owner's personnel, and that <br />Contractor maintains adequate records thereof. <br />c. Observe, record, and report to Engineer appropriate details relative to the test <br />procedures and systems start-ups. <br />d. Accompany visiting inspectors representing public or other agencies having jurisdiction <br />over the Project, record the results of these inspections, and report to Engineer. <br />10. Records: <br />a. Maintain at the Site orderly files for correspondence, reports of job conferences, <br />reproductions of original Contract Documents including all change orders, field orders, <br />work change directives, addenda, additional Drawings issued subsequent to the <br />execution of the Construction Contract, Engineer's clarifications and interpretations of <br />the Contract Documents, progress reports, Shop Drawing and Sample submittals <br />received from and delivered to Contractor, and other Project -related documents. <br />b. Prepare a daily report or keep a diary or log book, recording Contractor's hours on the <br />Site, weather conditions, data relative to questions of change orders, field orders, work <br />change directives, or changed conditions, Site visitors, daily activities, decisions, <br />observations in general, and specific observations in more detail as in the case of <br />observing test procedures; and send copies to Engineer. <br />c. Record names, addresses, fax numbers, e-mail addresses, web site locations, and <br />telephone numbers of all Contractors, Subcontractors, and major Suppliers of materials <br />and equipment. <br />d. Maintain records for use in preparing Project documentation. <br />e. Upon completion of the Work, furnish original set of all RPR Project documentation to <br />Engineer. <br />11. Reports: <br />a. Furnish to Engineer periodic reports as required of progress of the Work and of <br />Contractor's compliance with the progress schedule and schedule of Shop Drawing and <br />Sample submittals. <br />Page 3 �...�r..� <br />(Exhibit D - Resident Project Representative) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.