My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotations - Olive Production Well #6 Rehabilitation Project No 118-102 - Peerless Midwest Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Opening of Quotations/Proposals
>
Opening of Quotations - Olive Production Well #6 Rehabilitation Project No 118-102 - Peerless Midwest Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 9:14:10 AM
Creation date
11/14/2018 1:03:21 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/13/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
QUOTE/PROPOSAL CITY OF SOUTH BEND <br />PROJECT NAME: Oliver Production Well #6 Rehabilitation <br />PROJECT NO. <br />QUOTES DUE November 13. 2018. 9:30 AM <br />BASE QUOT <br />Item..................................._ <br />. ....... <br />._.._�. <br />I <br />No. <br />_.... <br />__...., ww........�� Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />Step drawdown test <br />1 <br />LS <br />$550.00 mmmmm <br />nnnnnnnn <br />m$550.00 <br />2 <br />Well Cleaning and Redevelopment <br />9 p <br />1 <br />LS <br />$21,400.00 i$ <br />21,400.00 <br />Pre-& Post Cleaning Video Inspection of <br />..... <br />3 <br />Casing and Screen <br />1 <br />LS <br />$810.00 <br />$ 810.00 <br />Disassembling and reassembling related to <br />4 <br />inspection of pump and driver <br />1 <br />LS <br />$330.00 <br />$ 330.00 <br />New Driver/Motor Premium Efficient Inverter <br />5 <br />Duty Unit. US Motor Brand <br />1 <br />LS <br />$12 350.00 <br />$ 12 <br />150HP 5173Amps <br />,350.00 <br />Frame: L444TP16 Part Winding Start <br />3 stage 14FKH Floway Pump Replacement <br />6 <br />or equal must conform to Hydraulic Institute <br />1 <br />LS <br />$ <br />HI 14.6 Grade 1U <br />$10,100.00 <br />10,100.00 <br />Replacement S40 Column Pipe: Pipe size <br />7 <br />12" 10-foot sections: Coupled <br />1 <br />LS <br />$732.00 <br />$ 732.00 <br />8 <br />_....................._................_ <br />Replacement S40 Column Pipe: Pipe size <br />1 <br />.._.. <br />LS <br />. .. <br />$493.00 <br />$ 493.00 <br />12" 5-foot sections: Coupled <br />. <br />Replacement Suction Pipe: Pipe size 10" <br />.. <br />9 <br />10-foot sections <br />1 <br />LS <br />$619.00 <br />$ 619.00 <br />....... _ <br />10 <br />.. <br />Replacement SS Column Line Shaft <br />1 <br />LS <br />$304.00 <br />$ 304.00 <br />10-Foot: Shaft Size: 1-1/2" <br />......................................-.._........... <br />Replacement SS Column Line Shaft <br />. ..................... <br />11 <br />5-Foot: Shaft Size: 1-1/2' <br />1 <br />LS <br />$152.00 <br />$ 152.00 <br />Shop / Refurbishment <br />12 <br />Hourly Labor Rate <br />1 <br />LS <br />$90.00 <br />$ 90.00 <br />Miscellaneous Well Components: <br />........ <br />13 <br />reconditioning/replacement <br />1 <br />LS <br />ALLOWANCE <br />$3,000.00 <br />Total <br />Amount of <br />$ 50,930.00 <br />Quote <br />Version 10/31/2017 Page - 16 Public Works Quote <br />
The URL can be used to link to this page
Your browser does not support the video tag.