My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotations - Edison Production Well #2A Rehabilitation Project No 118-103 - Peerless Midwest Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Opening of Quotations/Proposals
>
Opening of Quotations - Edison Production Well #2A Rehabilitation Project No 118-103 - Peerless Midwest Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 9:08:18 AM
Creation date
11/14/2018 12:59:30 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/13/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i� r% 4 r i Mai M N <br />November 13, 2018 <br />City of South Bend Dept. of Public Works <br />227 W. Jefferson Blvd. Room 1316 <br />South Bend, IN 46601 <br />RE: Edison Production Well #2A Rehabilitation Bid "Or Equal" Substitute <br />Dear Members of the Public Works Board: <br />We wish to provide an equal substitute for the specified 2 stage 14FKH Floway Pump bowl assembly <br />included as line item number 6 in the Edison Production Well #2A Rehabilitation bid. <br />National Pump Company manufactures a 2 stage H14MC bowl assembly that is constructed with the <br />same materials of ASTM A48 Class 30 Enamel Lined Cast Iron bowl castings, a 416 Stainless Steel <br />impeller shaft, ASTM B505-91 Alloy 876 bronze wetted parts, and ASTM B584-90B Alloy 952 bronze <br />impellers. This pump is rated for the same design condition of 2,800 gallons per minute at 132 feet of <br />total dynamic head, and requires the same horsepower motor. National Pump Company operates three <br />testing facilities, and has the capability to conform to Hydraulic Institute 14.6 Grade 1U standards. <br />Enclosed, please find correspondence from the Director of Engineering at National Pump Company <br />confirming this. <br />Peerless Midwest, Inc. is the authorized representative of Floway Pumps in this trading area, and if the <br />City of South Bend wishes to continue to pursue the 2 Stage 14FKH Floway Pump bowl assembly, we can <br />do that. However, in our opinion, due to significant cost increases and lead times exceeding 8 weeks, a <br />Floway Pump bowl assembly is not a valid option at this time. <br />Thank you for your consideration of allowing the National Pump H14MC bowl assembly to be used in <br />place of the Floway Pump 2 Stage 14FKH. We firmly believe that the National Pump option will provide <br />value to the City in up -front cost, as well as provide equal long-term reliability. <br />Please let us know if there are any questions, or if we can be of any further assistance, <br />Very Truly Yours, <br />PEERLESS MIDWEST, INC. <br />Frank T. Williams <br />Project Manager <br />55860 Russell Industrial Pkwy., Mishawaka, IN 46545 <br />574.254.9050 phone 574.254.9650 fax www.peerlessmidwest.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.