My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotations - Edison Production Well #2A Rehabilitation Project No 118-103 - Peerless Midwest Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Opening of Quotations/Proposals
>
Opening of Quotations - Edison Production Well #2A Rehabilitation Project No 118-103 - Peerless Midwest Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 9:08:18 AM
Creation date
11/14/2018 12:59:30 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/13/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
QUOTE/PROPOSAL CITY OF SOUTH BEND <br />PROJECT NAME: Edison Production Well #2A Rehabilitation <br />PROJECT NO. / 6 /03 <br />QUOTES DUE November 13, 2018, 9:30 AM <br />BASE QUOTE <br />Item_... <br />..... ._-._._._- <br />._ <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />_..._ <br />1 <br />.................._............____............._......�.._...... <br />Step drawdown test <br />1 <br />�_. <br />LS <br />$550.00 <br />$ 550.00 <br />2 <br />Well Cleaning and Redevelopment <br />1 <br />LS <br />$21,400.00 <br />$ 21,400.00 <br />3 <br />..... _...... ....�.................. ......... .._.......__._ <br />Pre-& Post Cleaning Video Inspection <br />_ <br />1 <br />__ <br />LS <br />$810.00 <br />$ 810.00 <br />of Casing and Screen <br />4 <br />Disassembling and reassembling <br />1 <br />LS <br />$330.00 <br />$ 330.00 <br />related to inspection of pump and driver <br />New Driver/Motor Premium Efficient <br />5 <br />Inverter Duty Unit. US Motor Brand <br />1 <br />LS <br />$9,775.00 <br />$ 9,775.00 <br />125HP <_142Amps <br />Frame: 40OTP Part Winding Start <br />2 stage 14FKH Floway Pump <br />6 <br />Replacement or equal must conform to <br />1 <br />LS <br />$8,650.00 <br />$ 8,650.00 <br />Hydraulic Institute HI 14.6 Grade 1U <br />Replacement S40 Column Pipe: Pipe <br />........................................... <br />1 <br />_- <br />LS <br />$1,780.00 <br />$ 1,780.00 <br />size 12" 10-foot sections: Flanged <br />$ <br />Replacement S40 Column Pipe: Pipe <br />1 <br />LS <br />$732.00 <br />$ 732.00 <br />size 12" 10-foot sections: Coupled <br />9 <br />L <br />Replacement S40 Column Pipe: Pipe <br />1 <br />LS <br />$1,352.00 <br />$ 1,352.00 <br />size 12" 5-foot sections: Flanged <br />10 <br />........... ........._..._. <br />Replacement S40 Column Pipe: Pipe <br />1 <br />LS <br />$493.00 <br />$ 493.00 <br />size 12' 5-foot sections: Coupled <br />11 <br />...�.______________ ........ ____� <br />Replacement Suction Pipe: Pipe size <br />........ <br />1 <br />........ <br />LS <br />$ <br />12" 10-foot sections <br />$619.00 <br />619.00 <br />12 <br />Replacement CS Column Line Shaft <br />1 <br />LS <br />............ <br />$232.00 <br />......... -. <br />$ 232.00 <br />10-Foot: Shaft Size: 1-15/16" <br />13 <br />Replacement CS Column Line Shaft <br />1 <br />LS <br />$178.00 <br />$ 178.00 <br />5-Foot: Shaft Size: 1-15/16° <br />_ <br />Shop /Refurbishment__. <br />.. <br />..._ _.. <br />12 <br />Hourly Labor Rate <br />1 <br />LS <br />$90.00 <br />$ 90.00 <br />13 <br />Miscellaneous Well Components: <br />1 <br />LS <br />ALLOWANCE <br />$3,000.00 <br />reconditioning/replacement <br />Version 10/31/2017 Page - 16 Public Works Quote <br />
The URL can be used to link to this page
Your browser does not support the video tag.