Laserfiche WebLink
DEPARTMENT OF PUBLIC WORKS <br />CITY OF SOUTH BEND, INDIANA <br />SPECIAL PROVISIONS <br />2018 Demolitions <br />Project No. 118-307 <br />PROJECT DESCRIPTION <br />The Project includes the demolition services associated with 23, More or Less, Vacant and <br />Abandoned Homes within the City of South Bend. Work includes, but is not limited to, the furnishing <br />of all equipment, material, and labor to complete the demolition as described in these Special <br />Provisions. The Work to be performed shall be the demolition and removal of the complete structure <br />including the basement, basement flooring, and other basement walls or stairways, and all other <br />appurtenant work on the site as specified in these documents, removal and disposal of all <br />demolition materials, remediation of asbestos containing materials as necessary, and final filling, <br />grading and white dutch seeding of the site as described in these documents. Unit pricing for <br />Asbestos Abatement is asked for each division in the event asbestos reports have not been <br />completed due to unforeseen conditions. <br />The homes are being demolished under an administrative action by the City's Department of Code <br />Enforcement and as such, the City reserves the right to adjust the number of homes to be <br />demolished by providing written notice to the Contractor. Accordingly, award of this Project is not <br />a guarantee to the Bidder that all 23 homes will be included in the final listing of properties to be <br />demolished under this contract. This is a divisible bid (Parts A-C) with each part being awarded in <br />its entirety. <br />II. PREVAILING SPECIFICATIONS AND DESIGN & CONSTRUCTION STANDARDS <br />The City of South Bend's PREVAILING SPECIFICATIONS, most recent version, and DESIGN & <br />CONSTRUCTION STANDARDS, most recent version, are to be used on this project. <br />Each Bid provider is specifically instructed to become completely familiar with the most recent <br />version of the PREVAILING SPECIFICATIONS and the DESIGN & CONSTRUCTION <br />STANDARDS prior to submitting a Bid. <br />Wherever the PREVAILING SPECIFICATIONS refer to "State Specifications," it shall mean the <br />2018 INDOT Standard Specifications for the letting effective after September 1, 2017. <br />These SPECIAL PROVISIONS will list only "Additions" or "Deletions" to the PREVAILING <br />SPECIFICATIONS and are to be used only in conjunction with the PREVAILING <br />SPECIFICATIONS. <br />In the event of conflict between the SPECIAL PROVISIONS and the PREVAILING <br />SPECIFICATIONS, the SPECIAL PROVISIONS will govern. <br />w <br />A. Prevailing Specifications: 2018, INDOT Standard Specifications Section 102 <br />B. Additions: <br />Version 8/16/2018 Special Provisions - 1 <br />