My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 1 - WWTP Headworks Gate Improvements Project No 117-026 - HRP Construction Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Change Orders
>
Change Order No 1 - WWTP Headworks Gate Improvements Project No 117-026 - HRP Construction Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 1:41:32 PM
Creation date
11/14/2018 12:37:56 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/13/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
J <br />ENGINEERS JOINT CONTRACT <br />DOCUMENTS COMMITTEE <br />Date of Issuance: November 2, 2018 <br />Owner: City of South Bend <br />Contractor: HRP Construction <br />Engineer: Arcadis US <br />Project: WWTP Headworks Gate Improvements <br />Change Order No. <br />Effective Date: <br />Owner's Contract No.: 117-026 <br />Contractor's Project No.: 1504 <br />Engineer's Project No.: 03029034.0000 <br />Contract Name: <br />The Contract is modified as follows upon execution of this Change Order: <br />COR #1 Credit for using existing conduits in primary gallery ..................................................... .... ($2,891.00) <br />COR #2 Credit for changing from cast iron to stainless steel gates...........................................($348,454.56) <br />Attachments: Contractor's Chan a Order Pro osals <br />CHANGE IN CONTRACT PRICE <br />Original Contract Price: <br />$ 966 500.00 <br />Increase from previously approved Change Orders <br />$ 0 <br />Contract Price prior to this Change Order: <br />$ , 9�66.500.00 <br />Increase of this Change Order: <br />$ 351 345.56 <br />Contract Price incorporating this Change Order: <br />( IVIM LADED• <br />By:�� <br />Engineer (if required) <br />Title: <br />Date: <br />CHANGE IN CONTRACT TIMES <br />Original Contract Times: <br />Substantial Completion: October 27, 2018 <br />Ready for Final Payment: November 26 2018 <br />Increase from previously approved Change Orders: <br />Substantial Completion: 0 days <br />Ready for Final Payment: 0 days <br />Contract Times prior to this Change Order: <br />Substantial Completion: October 27 2018 <br />Ready for Final Payment: November 27 2018 <br />Increase of this Change Order: <br />Substantial Completion: 20 days <br />Ready for Final Payment: 20 days <br />Contract Times with all approved Change Orders: <br />Substantial Completion: November 16 2018 <br />Ready for Final Payment: December 1.6; 2018_. <br />ACCEPTED: <br />By: By: <br />Owner (Authorized Signature) Contractor (Authoru gnature) <br />Title AJS/JTrI��C'/Trf�i�cG<��EreTitle Matthew D. Cain, President <br />Date //.•OS 20/1 Date 11 /05/1 8 <br />ak stozrrcr Tb $oA�2v of <br />fLt A" d- wgoees 4 PPR_PW I- <br />EJCDC" C-941, Change Order. <br />Prepared and published 2013 by the Engineers Joint Contract Documents Committee. <br />Pace 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.