My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6B (2)
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2012
>
03-27-12 Packet
>
6B (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2012 10:42:51 AM
Creation date
3/23/2012 1:28:11 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Prior to the Committee taking action, plans and specifications of the proposed project <br />must be reviewed by the Committee. The Committee will act on each application within <br />thirty (30) days of the receipt of the Application and Required Information. For a typical <br />building project, three (3) sets of plans and specifications must be submitted as part of <br />each Application. The following section, "Required Information," details the information <br />that must be included in the Application. One copy of the Application will remain on file <br />with the Committee. <br />REQUIRED INFORMATION <br />The Applicant starts the formal review process with the submission of an Application for <br />Design Review. Each Application must include the following information for Committee <br />action. <br />The following list identifies the information that must be included in each Application to <br />the Committee. The Applicant shall complete form, Application for Design Review, in its <br />entirety, and submit it with the required data. Each Applicant is encouraged to submit <br />preliminary drawings and information to the Committee for review before the formal <br />review process begins. <br />Required Information is as follows: <br />1. Architectural plans and specifications including Building elevations, types of <br />materials, exterior colors, exterior Site lighting, a brief description of mechanical <br />and structural systems, floor plans and roof construction and appurtenances; <br />2. A Site plan showing the location and design of all Improvements, including <br />without limitation: lighting plan, number, size and layout of parking spaces, <br />ingress /egress, setbacks, grading, drainage, easements, utilities, Sign locations, <br />refuse collection and bike paths; <br />3. Complete landscaping plan showing type, species, variety, location and size (at <br />installation) of all plantings including trees, shrubs, turf (seed or sod), irrigation <br />plans and natural conservation areas. Including identifying all trees of six (6) or <br />more inches in caliper which are specimen caliper plantings that will be removed <br />or destroyed. <br />4. Sign and /or Signage plans showing size, height, design, color, materials, <br />location, construction and lighting with respect to each intended Sign; <br />5. Site Amenities specifications showing size, height, design, color, materials, <br />location and construction with respect to each piece of Site Furniture and Site <br />Blackthorn Corporate Park — Development Guidelines 2123112 draft <br />
The URL can be used to link to this page
Your browser does not support the video tag.