My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6B (2)
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2012
>
03-27-12 Packet
>
6B (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2012 10:42:51 AM
Creation date
3/23/2012 1:28:11 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
vertical transitions. Where space limitations demand, terracing with <br />approved retaining walls shall be utilized. <br />C. Where retaining walls are required, they shall be of a material compatible <br />with the building architecture. <br />d. Berms, channels, swales, etc., shall be graded in such a way as to be an <br />integral part of the grading, and paved surfaces designed with smooth <br />transitions between changes in slope. <br />2. Proposed construction schedule covering each phase of construction on the Site; <br />3. Description of proposed operations and /or uses, including number of employees <br />expected and proposed for the future; <br />4. Characteristics of the intended use of the Site with emphasis on measures taken <br />to mitigate any adverse effects caused by the development; <br />7. Architect's total estimated cost of construction of the proposed improvements. <br />Owners are encouraged to construct additional paths on each lot and provide bike <br />storage areas on each Site for employees. <br />14 Blackthorn Corporate Park — Development Guidelines 2123112 draft <br />
The URL can be used to link to this page
Your browser does not support the video tag.