Laserfiche WebLink
vertical transitions. Where space limitations demand, terracing with <br />approved retaining walls shall be utilized. <br />C. Where retaining walls are required, they shall be of a material compatible <br />with the building architecture. <br />d. Berms, channels, swales, etc., shall be graded in such a way as to be an <br />integral part of the grading, and paved surfaces designed with smooth <br />transitions between changes in slope. <br />2. Proposed construction schedule covering each phase of construction on the Site; <br />3. Description of proposed operations and /or uses, including number of employees <br />expected and proposed for the future; <br />4. Characteristics of the intended use of the Site with emphasis on measures taken <br />to mitigate any adverse effects caused by the development; <br />7. Architect's total estimated cost of construction of the proposed improvements. <br />Owners are encouraged to construct additional paths on each lot and provide bike <br />storage areas on each Site for employees. <br />14 Blackthorn Corporate Park — Development Guidelines 2123112 draft <br />