My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6B (1)
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2012
>
03-27-12 Packet
>
6B (1)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2012 10:43:39 AM
Creation date
3/23/2012 1:24:11 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BLACKTHORN <br />CORPORATE PARK <br />By -Laws: Summary of Changes <br />Pg 1 Article 11 Section 1: change "benefit of to "benefitting <br />Pg 3 Article IV Section 2: change from semi annual meetings to annual meeting <br />Pg 4 Article IV Section 4: correct "Section 4" to "Section 3" <br />Pg 4 Article IV Section 6: change from semi annual meetings to annual meeting <br />Pg 5 Article VI Section 2: change from "October- January semi annual meetings" to "October <br />annual meeting" <br />Pg 6 Article VII Section 1: change from "October- January semi annual meetings" to "October <br />annual meeting" <br />Pg 7 Article VI Section 2 & 3: change from "October- January semi annual meetings" to <br />"October annual meeting" <br />Pg 7 Article IX Section 1: delete "semi" from semi annual meeting <br />Pg 8 Article IX Section 3: add "a copy" to corporate records <br />Covenants & Restrictions: Summary of Changes <br />Pg 8 Article IV Section 4.4: Educational Use added as permitted use in Blackthorn Corporate <br />Park (4/12/11) <br />Pg 9 Article IV Section 4.7.5: Educational Use added as permitted use in LI Light Industrial <br />zones (4/12/11) <br />Pg 12 Article V Section 5.4 (f): delete "non- refundable Review Fee and architect's cost <br />estimate" from Application from Approval <br />Pg 12 Article V Section 5.6.1: delete "Review Fee" <br />Pg 12 Article V Section 5.4 (f): delete "without an additional Review Fee" <br />Pg 14 Article VI Section 6.2 (c): delete "Review Fee" <br />Pg 21 Article VIII Section 8.3: change "required" to "encouraged" regarding Owners to <br />construct a bike path on their property <br />Pg 21 Article VIII Section 8.3: delete" The path must be within a corridor thirty (30) feet wide, <br />measured from the front and /or side boundary with a public right -of -way" to "The bike <br />path must be continuous from side property line ...... " <br />Pg 22 Article VIII Section 8.10: change landscape work completed "within six (6) months to <br />one (1) year" to "120 days" and change size of trees from "four (4)" to "six (6)" or more <br />inches. These changes will be make the covenants consistent with Design <br />Guidelines. <br />Pg 23 Article VIII Section 8.12: Added Chain link fencing is prohibited from all Blackthorn <br />"sites without specific approval of the Committee ". <br />Pg 31 Amendments VI: Education Amendment added 4/12/11 <br />Exhibits A -E: maps updated <br />Design Guidelines: Summary of Changes <br />Pg 7 Vehicle Circulation and Parking, Item 10: delete "with gutter" from curb requirements. <br />Pg 7 Pedestrian and Bicycle Circulation: delete section in entirety <br />Pg 8 Site Utilities, Item 2: delete entire item regarding septic systems <br />Pg 9 Site Signage, Item3: added new item "Electronic and digital signage is not permitted <br />in Blackthorn Corporate Park with specific approval of the Committee. <br />Pg 13 Maintenance, Item 6 (d): delete (d) in entirety. Guys stakes not required. <br />Pg 14 Additional Information, Item 5: delete entire item, anticipated water and sewer <br />demands not required for design review <br />Pg 14 Additional Information, Item 6: delete entire item, site amenities requirements are <br />noted in Design Review submittal requirements. <br />
The URL can be used to link to this page
Your browser does not support the video tag.