Laserfiche WebLink
Alibaba Annexation Area 5 <br /> SECTION III. MUNICIPAL SERVICES <br /> A. Public Works <br /> Sewer - No sewer lines abut the property. The nearest sewer available is on Ironwood Drive, <br /> approximately 500 feet to the southwest. A sewer extension and connection would be done at <br /> the petitioner's expense. The petitioner may continue to rely temporarily on the property's <br /> septic system. Upon failure of the septic system after the effective date of annexation, the <br /> petitioner will be responsible for connection to the City's main line provided that the main line <br /> has been extended reasonably proximate to the petitioner's property line. If this has not <br /> occurred at the time of septic failure, the petitioner may continue to use a septic system at its <br /> sole expense. <br /> Water - The South Bead Water Works currently has a 12" water main on the south side of <br /> State Road 23 and a 6" water main on the west side of Terrace Lane. The main on Terrace <br /> Lane is a dead-end main that terminates at Dunn Road. A 1" service line tapped off the <br /> Terrace main has a listed address of 17917 East State Road 23. <br /> The nearest flow test data is at Maple Lane and Roosevelt Street, about 650 feet from the <br /> Annexation Area. A flow test on October 28, 2010, indicated a static pressure of 49 psi, <br /> residual pressure of 42 psi, and a flow rate of 948 gallons per minute. There is sufficient <br /> capacity for the Annexation Area. <br /> Extensions of, or taps into sanitary sewer and water lines shall be governed by I.C. 36-9-22- <br /> 2, I.C. 8-1.5-3 and 4, and the rules and regulations of the South Bend Water Works and <br /> Sewer Utility. <br /> Street Lighting - No additional street lighting will be necessary. The existing street lighting <br /> system adequately covers this area. <br /> Waivers of Annexation - A waiver of right to remonstrate against annexation is in effect for <br /> this area. <br /> Street;- State Road 23 is a state highway and will continue to be maintained by the Indiana <br /> Department of Transportation. If the annexation proceeds, the City and County will confer to <br /> mutually agree on a maintenance plan for the boundary streets of Terrace Lane and Dunn <br /> Road. No capital expenditure will be needed to extend sweeping and snow removal service to <br /> the area. Gas tax reimbursements to the Motor Vehicle Highway Fund pay for operation of <br /> the service. <br /> 2011 Actual Budget Report for the Department: <br /> Expenditures: $9,402,157 <br /> Miles of Roadway in City: @499.3 <br /> Cost per Mile: @$18,830 <br /> New Mileage within Area: @0.04 miles (220 feet) <br /> Estimated Maintenance cost <br /> for Annexation Area per year: @$753 <br />