My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/23/1915 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1915
>
11/23/1915 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 1:00:55 PM
Creation date
11/5/2018 10:03:08 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
11/23/1915
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Tue s <br />er 23rd.1915. <br />Board met in regular session, at 10:00 A.M. Al members present. <br />Remonstrances received from Attys. for J. .Studebaker against assessment <br />of damages on Widening of Eddy Street and Mishawaka Avenue. The same were read and placed <br />on file. <br />Bond and contract for Pipe sewer on Indiana Avenue from Michigin Street to <br />Pain Streets under Improvement Resolution Ito. 409 signed by Staples and AckerrFan we <br />approved by the Board. <br />Bond s.-Ii contract for pipe sewer on Fox .Street from St. Joseph St.. <br />to`Fellows Street, under Impmvement Resolution No. 412. sued by Staples And Ackear.an <br />and approved by the Board. <br />Communication received from Ja_es A. Judie with bill from W.W.Sibley <br />Company for repairing cave in on Michigan Street.. The same was read, and placed on file. <br />The following communication was received from the County Attorney dead <br />and placed on file, the Board to make a trip and investigate said Ernsperger Street. <br />Nov. 22nd,1915. <br />Board of Public Works <br />South Bend, Indiana. <br />Gentlemen: — <br />IN THE MATTER OF THE DRAINAGE OF ERNSPERGER ROAD,EAST OF TF- IS CITY AND <br />SOUTH OF THE LAKE SHORE TRACKS. <br />The Board of County Commissioners was out there today to view this road, <br />and instructed me to write you regarding the drainage of the same. They fear that unless <br />some provisiions be made to take care of the drainape this fall, that by spring this road <br />will be almost unpassable, and be of great injury to the same. <br />Will you kindly take this matter up with your engineer regarding it, <br />and advise this Board at your earliest convenience ghat action you have taken in regard to <br />same? <br />Thanking you for your consideration in the matter, I am, <br />Yours truly, <br />P . J. TTOULIHAN, <br />County Attorney. <br />Upon report of the City Engineer the fb llowing order was sent to the <br />City Controller. <br />To tie Cit;7 Controller. <br />City: — <br />Dear Sir <br />You are hereby requested to turn over to DePeape Coussens $100.00 held by <br />you by order of the Board of Public Works as a guaranty for work to be peri'nrred on the <br />Dubail Avenue sewer. <br />The Street Commissioner filed with the Bo€. „d request from the Grand Trunk Ry. Co. foreman <br />Chas. Bovmtan to u-se. crushed stone between tracks at Ford St. crossing (both street and <br />sidewalk) and recommended that permission be given Grand Trunk- R'y. Co. to to use crushed <br />stone base with screen ng top, and well tamped at this particular crossing. The Board <br />approved Street Commissioners report. <br />The Street Commissioner was instructed to enforce the followAng letter <br />received by him from the foreman of the Grand Trunk Ry. System, which reads as follows: — <br />Mr. Chas. Bowman, <br />B.&B. Foreman —Battle Creek,. <br />Dear Sir : In connection with the repairs required to brick platform and sidewalk at <br />St. Joseph Street, South Bend. <br />You may arrange to have this work done as outlined in Supervisor of <br />Bridges & Buildings Sander's letter of November 19th. and arrange with Mr. Layton to have <br />this amount ,viz., $35.20 assessed against the property. <br />Yo.j rs truly, <br />J. E. Ehre, <br />Sup a .ri- - fiendent . <br />The City Contractor to be notified to construct cement walk .40 ft. frontage(Old Freight <br />House) S.-St. Joe. Street north of Division St. (6 ft. walk) , Also return curb at .11. line <br />of &ld freight house. <br />
The URL can be used to link to this page
Your browser does not support the video tag.