Laserfiche WebLink
Ivy Tower Phase II <br />February 27, 2012 <br />Page 5 of 7 <br />SCHEDULE <br />Wightman Petrie proposes to commence site investigation activities within one (1) week of receipt of <br />notification to proceed, depending on weather, utility clearance and Geoprobe availability. Our Ground <br />Penetrating Radar Survey work will be completed prior to the initiation of and soil boring installation <br />activity, and can commence immediately following the receipt of Authorization to Proceed. Once a <br />specific date for the field component of the Phase II has been established, Wightman Petrie will notify the <br />client. Upon mobilization, we anticipate completion of the Geoprobe sampling requiring two (2) days. <br />Laboratory analyses will be completed by Pace Analytical on standard one -week turnaround from receipt <br />by the laboratory. Our initial discussion of results will occur within one (1) day of receipt of laboratory <br />analytical results. Our written "Summary Letter Report" will be submitted within one (1) week of the initial <br />conference. <br />COST ESTIMATE <br />An ESTIMATED COST for Phase II Environmental Assessment Services is presented as follows: <br />Field Engineering Services /Project Management $2,000 <br />Limited Ground Penetrating Radar Survey $ 900 <br />Geoprobe Rental (assumes 2 -days $1,700 /day, including mobilization) $3,400 <br />Laboratory Analysis: <br />14 soil samples for % Moisture @ $10 /sample $ 140 <br />14 soil samples for analysis of VOC constituents @ $95 /sample $1,330 <br />14 soil samples for analysis of carcinogenic PAHs @ $95 /sample $1,330 <br />11 groundwater samples for analysis of VOC constituents @ $95 /sample $1,045 <br />7 groundwater samples for analysis of carcinogenic PAHs @ $95 /sample $ 665 <br />TerraCore Soil Sampling Kits (36 kits @$15 /kit) $ 540 <br />Reporting $1,250 <br />ESTIMATED COST $12,600 <br />Please note that this ESTIMATED COST should be considered a Project Maximum, which Wightman <br />Petrie will not exceed without prior approval. However, should the scope of services require modification <br />(i.e., additional borings) based upon field conditions and /or circumstances that would not have otherwise <br />been anticipated, Wightman Petrie will notify the client of such "changed conditions" and resultant cost <br />implications to the project. <br />LIMITATIONS /QUALIFICATIONS <br />The sampling and testing of soil, groundwater and /or other materials not specifically identified in this <br />proposal is beyond the scope of services for this project. Cost estimates for our proposed services have <br />been prepared based on the following assumptions: <br />• Wightman Petrie will have unlimited access to the site during daylight hours; <br />• No subsurface obstructions (buried utilities or fill debris) will interfere with our work; <br />• Sufficient access /clearance will be provided for exterior Geoprobe locations; <br />• Groundwater will be encountered within 25 -feet of ground surface; <br />• Inclement weather will not interfere with the completion of our field work; <br />• Soil cuttings and purge waters will be returned to the boring from which they were generated, with <br />the remainder of the boring filled with bentonite pellets to land surface. <br />This Phase II Environmental Site Assessment should be considered as a "tool' in the evaluation of the <br />subject site relative to the potential presence of contaminants, and does not necessarily fulfill Indiana <br />Department of Environmental Management (IDEM) guidelines for delineation of contaminants identified <br />within soil or groundwater as required under UST Closure Guidelines. <br />