Laserfiche WebLink
REGULAR MEETING FEBRUARY 14, 2012 47 <br />APPROVE TRAFFIC CONTROL DEVICES INSTALLATION <br />Upon a motion made by Mr. Inks, seconded by Ms. Roos and carried, the following traffic <br />control device installations were approved: <br />NEW INSTALLATION: Handicapped Accessible Parking Space Sign <br />LOCATIONS: 1833 Nash Street <br />1526 Mishawaka Avenue <br />REMARKS: All Criteria has been Met <br />DENY TRAFFIC CONTROL DEVICE INSTALLATION <br />Upon a motion made by Mr. Inks, seconded by Ms.Roos and carried, the following traffic <br />control device installation was denied due to better access via a driveway to the entrance <br />available at the residence: <br />TRAFFIC CONTROL DEVICE: Handicapped Accessible Parking Space Sign <br />LOCATIONS: 1022 North O'Brien Street <br />REMARKS: Better Access with Driveway up to Entryway <br />APPROVE REVISION OF WASTEWATER DISCHARGE PERMITS <br />In a Memorandum to the Board, Ms. Kim Thompson, Division of Environmental Services, <br />recommended the revision of the classification of the following Wastewater Discharge Permit <br />users to a less stringent category: <br />a) South Bend Absorbtech, 3900 West William Richardson Drive <br />b) SES Environmental, 110 Dixie Way South <br />c) Ark Engineering Services, Inc., 2334 Prairie Avenue <br />There being no further discussion, upon a motion made by Mr. Inks, seconded by Ms. Roos and <br />carried, the revision to the permits was approved. <br />RATIFY APPROVAL AND /OR RELEASE EXCAVATION BONDS <br />Mr. Anthony Molnar, Division of Engineering, recommended that the following Excavation <br />Bonds be ratified pursuant to Resolution 100 -2000 and/or released as follows: <br />Business <br />Bond Type <br />YP <br />Approved/ <br />Released <br />Effective Date <br />TBE Group, Inc. DBA Cardno TBE — <br />Excavation <br />Approved <br />January 25, 2012 <br />Niezgodski Plumbing, Inc. <br />Excavation <br />Approved <br />January 23, 2012 <br />Turnkey Network Solutions <br />Excavation <br />For Release <br />Effective February <br />2, 2012 <br />Fiber Optic Management DBA Turnkey <br />Excavation <br />Approved <br />January 23, 2012 <br />Network Solutions <br />Niezgodski Plumbing, Inc. <br />Excavation <br />For Release <br />Effective <br />November l , 2012 <br />Mr. Inks made a motion that the Bonds approval and/or release as outlined above be ratified. <br />Ms. Roos seconded the motion, which carried. <br />- APPROVE CLAIMS <br />Mr. Inks stated that a request to pay the following claims in the amounts indicated has been <br />received by the Board; each claim is fully supported by an invoice; the person receiving the <br />goods or services has approved the claims; and the claims have been filed with the City Fiscal <br />Officer and certified for accuracy. <br />Name Amount of Claim Date <br />City of South Bend $156,394.19 02/07/2012 and <br />02/10/2012 <br />