My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6E (1)
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2012
>
02-14-12 Packet
>
6E (1)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2012 11:34:58 AM
Creation date
2/10/2012 11:43:02 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
® ATTACHMENT A <br />DLZ INDIANA, LLC <br />STANDARD FEE STRUCTURE <br />ENGINEERING /ARCHITECTURAL <br />2011 <br />Activity <br />Code <br />Eln to ee Chisiftcation <br />2011 <br />Hourly Rate <br />1 <br />Principal <br />$220.00 <br />49 <br />Division Manager (Chief Engineer) <br />$175.00 <br />50 <br />Department Manager <br />$160.00 <br />55 <br />Registered Land Surveyor <br />$130.00 <br />21 <br />Project Manager <br />$135.00 <br />214 <br />Senior Right-of-Way Engineer <br />$135.00 <br />330 <br />Electrical Engineering Specialist <br />$150.00 <br />53/58 <br />Engineer III/Architect III/Landscape Architect IIV <br />Planner III/Scientist III/Geologist III <br />$125.00 <br />52/57 <br />Engineer II/Architect II/Landscape Architect Il/ <br />Planner II/Designer III/Scientist II/Geologist II <br />$115.00 <br />51/56 <br />Engineer I/Architect I/Landscape Architect It <br />Planner U Designer I1/Scientist I/Geolo ist I <br />$90.00 <br />28 <br />Designer I <br />$75.00 <br />29 <br />Technician <br />$65.00 <br />147 <br />Construction Administrator <br />$105.00 <br />152 <br />Construction Observer <br />$85.00 <br />43 <br />Clerical <br />$50.00 <br />Reimbursable Ey enses <br />Crew Classi cation <br />2011 <br />Hourly Rate <br />143/99/99 <br />3 — person Survey Crew <br />$185.00 <br />142/99 <br />142/99 <br />Topographic Survey Crew (straight time) <br />Topographic Survey Crew (over time) <br />$145.00 <br />$220.00 <br />63 <br />1 — person Field Crew <br />$100.00 <br />63 <br />1 — person Field Crew (over time) <br />$140.00 <br />GPS <br />1 — person GPS /RTK Field Crew <br />$160.00 <br />13 <br />Field Survey Technician <br />$55.00 <br />Reimbursable Ey enses <br />Rate <br />Mileage <br />$0.445/mile <br />Travel Expenses <br />@ Cost <br />Living Expenses <br />@ Cost <br />Reproduction <br />Cost plus 20% <br />Subconsultants <br />Cost plus 20% <br />Equipment Rental <br />Cost plus 20% <br />Rates are subject to revision on January 1, 2012. <br />Cost of living/inflation increases of 3 to 7% per annum can be anticipated. <br />S: Vkpt\ Administratxm \ClcricaRRAn.S\2011 Hourly Rates.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.