My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-17-18 Personnel and Finance (#9)
sbend
>
Public
>
Common Council
>
Minutes
>
Committee Meeting Minutes
>
2018
>
Budget Hearing Minutes
>
09-17-18 Personnel and Finance (#9)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2018 8:32:43 AM
Creation date
10/26/2018 8:32:30 AM
Metadata
Fields
Template:
City Council - City Clerk
City Council - Document Type
Committee Mtg Minutes
City Counci - Date
9/17/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SOUTH BEND OFFICE OF THE CLERK <br /> Mr. Horvath stated, I'll get with Sue on the location of where those lights are at on Sample Street. <br /> In terms of the total number of lights, 9,800 are AEP lights,and about 2,300 are City-owned lights. <br /> Building Department <br /> Chuck Bulot, Building Commissioner with offices at 135 S. Lafayette Blvd., stated, The Building <br /> Department's goal is to ensure the safety and quality of the building environment through the <br /> expeditious issuance of permits, distribution of up to date property information and timely <br /> inspections of projects. This goal can be achieved by streamlining the issuance of permits, the <br /> certification of all inspectors, having consistency in processing procedures, and innovation. Our <br /> overall budget summary, in terms of revenue, has a projected two percent (2%) increase over the <br /> 2018 budget and the same for over the next three (3)years. If there is any kind of leveling off, the <br /> maximum activity would last for approximately three (3) years before any sufficient downturn, <br /> primarily due to the back log of any ongoing projects. We have upgraded a couple of our vehicles <br /> to all wheel drive for better site access. We have had problems in the past with accessing certain <br /> work sites due to weather and things of that nature. In regards to personnel changes,we now have <br /> eight (8) Inspectors and they are all now filled. We are preparing to hire a full-time Secretary <br /> position and there are no new full-time employees budgeted for at this time. The thirteen(13) staff <br /> that is currently from our fifteen (15) is that we are planning with the City to include two (2) of <br /> our staff for the current proposed Zoning Administration for the City. This will better help you <br /> understand how this will be better organized. The Building Department would move under the <br /> Department of Community Investment. We have a Deputy Building Commissioner, an overall <br /> Building Inspector that would supervise the other inspectors and a License Administrator that <br /> would work on behalf of the City that would work with permitting and zoning. We have three (3) <br /> Administrative Assistants,a Permanent Secretary, and a Violation Auditor for the Zoning Auditor. <br /> Our overall staff changes include us having one (1) or two (2) people retiring at the end of 2018 <br /> and three (3) more than likely within the next two (2) years. We have had an addition of a new <br /> Instructional Inspector which builds our current budget. We are looking at a change of title for our <br /> Design Plan Review Specialist to the Deputy Building Commissioner. We look to have a total of <br /> thirteen(13)full-time employees after the transfer for Zoning Administration. We look to integrate <br /> a Business License Administrator into the License and Registration Administrator. Then the <br /> License Auditor is looking to be a part-time Auditor and the cost is covered by expected donations. <br /> He continued,2018 accomplishments for the Building Department include, and are verifiable,that <br /> all of our permits are tracked by a timing device so it's verifiable for different permits. They are <br /> all processed within three (3) minutes and we have met that goal within three (3) years. It's a <br /> testament to the quality of the current personnel that operate the processing of permits. We have <br /> two (2) new Building Inspectors and one (1) of them is instructional. Five (5) new inspector <br /> certifications include CBO, which is Certified Building Official in legal aspect, Plumbing Plan <br /> Examiner, Residential Plumbing, Residential Electrical, and Commercial. We have also <br /> transferred the ABZA duties to Area Plan so we can focus more on building issues. We have also <br /> included over the past year, two (2) new Spanish-speaking personnel for better inclusive service <br /> in the community. Our 2019 goals and challenges include hiring, training, and rotating new staff <br /> into the retirement positions as well as increasing our attendance at the national level building and <br /> flood meetings. We also look to begin certification incentives for front-office personnel. We are <br /> installing a credit card point of sales station for the office and will have limited online use. We <br /> look to reduce the turnaround time for planning new notes and new information. We are <br /> implementing online outreach information for the community through City mailings. We'll do that <br /> EXCELLENCE I ACCOUNTABILITY I INNOVATION I INCLUSION I EMPOWERMENT <br /> 455 County-City Building 1 227 W Jefferson Bvld 1 South Bend,Indiana 466011 p 574.235 9221I f 574.235.9173 j TTD 574.235.5567 j www.southbendin.gov <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.