My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Two or More 2018 or Newer Single Axle Dump Truck - Spec X - Truck Centers Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Opening of Bids
>
Opening of Bids - Two or More 2018 or Newer Single Axle Dump Truck - Spec X - Truck Centers Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2025 1:33:01 PM
Creation date
10/25/2018 9:20:41 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
10/23/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
F°Hled ur'u by VY'A Juries <br />TYPE <br />DESCRIPTION <br />SHALL BE AS <br />SPECIFIED <br />(Circle One) <br />Rust Five year minimum, full repair warranty. Cab and chassis YES / NO <br />Proofing: to have Ziebart rust proofing and Rhino lining for under <br />Dump bed. <br />Safety: Truck and equipment to conform to all State and Federal YES / NO <br />Requirements, as well as O.S.H.A. and D.C.T. Back up <br />Alarm to be included. <br />Colors: Sewer Department — White Cab, Dark Green Dump Bed Dupont YES NO <br />#474110B PFGS7 <br />Manuals: Complete set for chassis, engine, electrical, transmission, all add YES NO <br />on equipment. Can also be CD or DVD. Must include access to <br />factory website for trouble shooting and parts lookup. Must <br />include I year subscription for factory cab/chassis <br />troubleshooting software. <br />Training: Vendor to include up to eight hours of training for trouble shooting YES NO <br />and parts software and website for Central Services employees. <br />Specifications for 10' Dump Bo <br />The intent of these specifications is to obtain a durrib body which meets the highest standards of the <br />industry with respect to quality and strength of materials, design and workmanship to the finished <br />product. Bidder MUST be an authorized representative of the manufacturer and able to provide <br />complete warranty service. <br />Heavy Duty Note: Body builder must have a pre build conference with the (YES / NO <br />Dump Body: purchaser to go over layout and placement off all equipment <br />and two such sessions during equipment installation. No <br />equipment shall be installed without approved authorization <br />from purchaser. - <br />BODY: <br />These specifications shall describe a heavy-duty dump body, Ice and <br />Snow control equipment to be used by the City of South Bend <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.