Laserfiche WebLink
W= A <br />J.-Imm IA Document G701 TM -2017 <br />PROJECT: (Name and address) CONTRACT INFORMATION: <br />CHANGE ORDER INFORMATION: <br />17398 - Fire Station Number 9 Contract For: General Construction <br />Change Order Number: 001 <br />2108 Mishawaka Avenue Date: March 13, 2018 <br />Date: September 26, 2018 <br />South Bend, IN 46615 <br />OWNER: (Name and address) ARCHITECT: (Marne and address) <br />CONTRACTOR: (Name and address) <br />City of South Bend EPOCH Architecture + Planning <br />Ziolkowski Construction, Inc. <br />Board of Public Works <br />227 West Jefferson Blvd 300 West Jefferson Blvd <br />4050 Ralph Jones Drive <br />South Bend, IN 46614 South Bend, W 46601 <br />South Bend, IN 46628 <br />THE CONTRACT IS CHANGED AS FOLLOWS: <br />(117sert a detailed description of the change and, if applicable, attach orreference specific exhibits, Also b7clude agreed upon adjustments <br />attributable to executed Construction Change Directives) <br />RCO #001 = Items 3, 4, 5, 6, 8, 11 & 10, acceptance of combined value = Deduct $5,205.00 <br />RCO 4002 = addition of two vision panels per overhead coiling door at a cost of $6,395.00, not accepted = Add $0.00 <br />RCO #003 = change (deduct (22)30" Dante Wardrobe Units and add (22) Roomscape Combo Wardrobes at a cost of <br />$25,961.00, not accepted = Add $0.00 <br />RCO 4004 = Items 1, 2, 7 & 9, acceptance of combined value = Deduct $2,321.00 <br />RCO $005 = Items I & 2, acceptance of combined value = Deduct $1,640.00 <br />The original Contract Sum was <br />$ 3,652,500.00 <br />The net change by previously authorized Change Orders <br />$ 0.00 <br />The Contract Sum prior to this Change Order was <br />$ 3,652,500.00 <br />The Contract Sum will he decreased by this Change Order in the amount of <br />$ 9,166-00 <br />The new Contract Surn including this Change Order will be <br />$ 3,643,334.00 <br />The Contract Time will be increased by Zero (0) days, <br />The new date of Substantial Completion will be en . a S - <br />NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract <br />Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the <br />Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive, <br />NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER, <br />EPOCH Architecture <br />Ziolkowski Construction, Inc, <br />ARCHITECT W CONTR41TOVFir)n nalne) <br />SIG T A� <br />SIGNATURE <br />Al Bill Favors, President & CFO <br />PRINTED NAME AND TITLV PRINTED NAME AND TITLE <br />lo,I,Kl /,!; September 27, 2018 <br />DATff / —/ DATE <br />City of South Bend hoard of Public <br />Works <br />OWNER (1T7r777jgw7e) <br />SIGNATURE <br />PRINTED NAME AND TITLE <br />I o", <br />DATE 7)RJVJ 01 <br />A <br />A�A Document G70IT11-2017, Copyright G) 1979, 1987, 2000 , 2001 and 2017 by Tice American Institute of Architects. E ed' "P <br />A Ae Docurnent is protected by U.S. CopyNght Law and Mternationat Treafles, Ulvm"thorlzed reproducUon Or distrib 1 w Wt o <br />any porkin of ft, rnay result in severe civH and cNminai pen,aifies, and vdH be prosecuted to Um maxinuun extoult7l' "I'm 0 L E awl, s <br />document was produced by AIA software of 13:53!35 on 09/27/2018 under Order No. 1093394963 which expires on 07106/2049,a ' Inot <br />User Notes: (3139ADA38) <br />