My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 1 to PSA - SmithGroup JJR, Inc - Final Design for Seitz Park, East Race Pedestrian Crossing, East Bank Trail, Etc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Agreements, Contracts, Proposals
>
Amendment No 1 to PSA - SmithGroup JJR, Inc - Final Design for Seitz Park, East Race Pedestrian Crossing, East Bank Trail, Etc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 8:22:03 AM
Creation date
10/25/2018 9:06:30 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
10/23/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
This is EXHIBIT K, consisting of 3 pages, referred to in <br />and part of the Agreement between Owner and Engineer <br />for Professional Services dated Dec 12, 2017, <br />AMENDMENT TO OWNER -ENGINEER AGREEMENT <br />Amendment No. _1 <br />1. Background Data: <br />a. Effective Date of Owner -Engineer Agreement: Dec 12, 2017 <br />b. Owner: Board of Public Works, City of South Bend, Indiana <br />C. Engineer: SmithGroupJJR Inc. <br />d. Project: Seitz Park Reconstruction, South Bend Project No. 117-093 <br />2. Description of Modifications: <br />a. Engineer shall perform or furnish the following Additional Services: <br />1) Perform Task 3: Documentation as previously described in Attachment A to <br />complete Preliminary Engineering, Permitting, Final Engineering and Construciton <br />Documents. <br />b. The Scope of Services currently authorized to be performed by Engineer in accordance <br />with the Agreement and previous amendments, if any, is modified as follows: <br />1) The limits of the scope of work to be included in the final construction documents <br />has been revised per the Schematic Design deliverables. Please refer to attached <br />Exhibit K-I that graphically outlines the limits of work. <br />2) SmithGroupJJR Inc. will be performing the underground civil engineering replacing <br />the role DLZ performed in Task 1 and 2. <br />3) SmithGroupJJR Inc. will be subcontracting with local geotechnical firm and local <br />dive inspection firm to complete further field investigaitons under Task 3. <br />4) The project documentation will be divided into two phases as follows: <br />a) Phase 1: South Riverwalk and East Parking Entry/Parking improvements (site <br />elements located east of the East Race and not impacted by UND Hydroelectric <br />construction) <br />b) Phase 2: North Rivet -walk, Seitz Park and East Race <br />5) SmithGroupJJR Inc. will complete up to 90% Engineering drawings for all phases <br />of the project. Final Design & Bidding documents will proceed for Phase 1 only <br />with anticipation to begin construction within 2019. Final Design & Bidding <br />documents will proceed for Phase 2 upon substational completion of the UND <br />Page 1 <br />(Exhibit K— (Amendment to Owner -Engineer Agreement) -- Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright c0 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.