My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 1 to PSA - Black and Veatch Corporation - Olive GAC Plant Replacements and Refurbishments
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Agreements, Contracts, Proposals
>
Amendment No 1 to PSA - Black and Veatch Corporation - Olive GAC Plant Replacements and Refurbishments
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 8:20:56 AM
Creation date
10/25/2018 9:05:28 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
10/23/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
This is EXHIBIT K, consisting of 3 pages, referred to in <br />and part of the Agreement between Owner and Engineer <br />for Professional Services dated June 12, 2018. <br />AMENDMENT TO OWNER -ENGINEER AGREEMENT <br />Amendment No. 1 <br />1. Background Data: <br />a. Effective Date of Owner -Engineer Agreement: June 12, 2018 <br />b. Owner: Board of Public Works, City of South Bend, Indiana <br />C. Engineer: Black & Veatch Corporation <br />d. Project: Hydraulic Modeling Training and Olive WTP Improvements Preliminary <br />Engineering <br />2. Description of Modifications: <br />a. Engineer shall perform or furnish the following Additional Services: <br />Task 3 — Quality Control Review of Requests for Proposals <br />Engineer will complete the below services related to review of Request for <br />Proposal (RFP) packages developed by the Owner. <br />Engineer will provide chemical feed, instrumentation and control, architectural, <br />electrical and hydrogeologic professionals to provide a technical review of the <br />below listed RFP packages developed by the Owner: <br />a. RFP 118-021A — North & South Cleveland Well Field Refurbishments — <br />Programming -related Items <br />b. RFP 118-021B —North & South Cleveland Well Field Refurbishments — <br />Chlorine Gas System & Bulk Fluoride Tank Replacement <br />c. RFP 118-021C —North & South Cleveland Well Field Refurbishments -- <br />Well Cleaning <br />d. RFP 118-021D — North & South Cleveland Well Field Refurbishments — <br />Repairs <br />Engineer will prepare one technical memorandum that summarizes the review <br />comments for the four RFP packages for the Owner's use in preparing the final <br />RFPs. The final technical memorandum will be delivered to the Owner in digital <br />Page r <br />(Exhibit K — (Amendment to Owner -Engineer Agreement) —Attachment r) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC, All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.