Laserfiche WebLink
Board met in regu7.ar sess ion at 10: 00 A.M. All members present. <br />Tha check of, Brund..De Peape Contractor on :the. La SaLle Avenue <br />sewer ordered released. by the Board. <br />Partial estimate allowed `Williston Construction Company on <br />Werner Street and Car <br />roil Street asphaltic concrete pavement, at <br />Pet it ion for a light on, Fisher Stet betireen Laurel Street <br />and Chapin Street received read and referred to Bean-ing for report. <br />Mr. D. C..Layton, 'St. Commissioner instructed to draw up a letter <br />with all the facts about the crematory condition and submit same to the Board so that <br />:fist �b this matter can be taken up with the Common Counc it .. <br />Chief Sibrel,, Nelson Ryser and Harry E. Joseph, Clerk of the <br />.Safety Beard appeared before the Board in -regard to the repairs on the fire stations. <br />The Board` authorized the Chief of the Fire Department to have the necessary repairs made <br />to the differaant fire stations, the work to be dome either by ampisyees of the Various <br />fir* stations or outside contractor , same left to the r iscret ion• of the Fire Chief, who <br />is to have supverision and control and the bills to be rendered to -the Bo&lid of Public <br />Works for payment. <br />The Board granted an extension of time to of sixty (60) days <br />in which to complete the Studebaker Street pavement contract by Williston Constr. Cos <br />Attorney S. Pettingill appeared. before the Board with Mr. <br />Gatilmon in regard to ' The George Cutter: Ctapany blocking D iv is,ion Street with, freight <br />cars on Div is ion Street. No action taken on same. <br />The Board granted the Western Construction Company an extension <br />of ninety (90) days in which to complete pavement improvement an Birdsall Street. <br />Also granted the White Construction Company an ex' ensign of -Ninety (90) days in which <br />to compLets pavement improvement on Lincoln Way West and Olive Street pavement improve <br />ment. <br />4 <br />I <br />Iu regard to the final award of contract on Van Buren Street <br />and Eddy Street, this matter was deferred until Tuesday October nth. ,1919 at 10: 00 A.M. <br />i <br />I <br />The Board ordered that a n4ice be sent to *the City Bl�mbing <br />that he is net to issue permits to plumbers to co act to new sewer and the sewers <br />will have to be accepted by the Board of Public W rks and the City first. <br />The Board instructed the Street Commissioner to place guard <br />rails 6X 6.al*ng the walk across the Hydraulic Avenue Bridge ever the'Esst Rae*, the <br />full length of the bridge on the north side. <br />The Board took up the mat or of painting of bridges and railings <br />with D. C. Layton, Street Commissioner. <br />The following final award# were approved by the Board. <br />