Laserfiche WebLink
175 <br />Pipet sewer on Spruce Street. <br />Bid of Geo. , A. Harrop, o <br />10 inch pipe sewer, per lih ft.., ..,......... .,$?.40 <br />8 inch pipe sewer, par. lin ft... ................1.00 <br />6 inch pipe sewer, per tin ft.........,.. ....,....100 <br />Manholes per lin ft........,......................6.00 <br />Manholes curb and covers, each...................1L).00 <br />Storm water inlets, each .. ......................10.00 <br />Check for $100.00 <br />St. Peter and Corby Street -Pipe sewer. <br />Bid of Joseph A. Luther. <br />12 inch pipe sewer per lin ft...................$ 2.50 <br />Mallubles per ft........................ ... 5 00 <br />Manholes, curb s ' and covens, each.... 18.00 <br />Check for $100.00 <br />All of the above bids were. referred to the City Civil Engineer <br />for report Wednesday September 17th. ,1919 at 7:15 P.M. <br />r <br />Mr. Joseph Eckman appeared before the Board in regard to <br />a plat on South Michigan Street. The Board agreed to make trip to inbestigate same. <br />Mr. L. P. Hardy appeared before the Board in regard to a permit <br />which was .allowed by the Board- s ome months ago, about putting sewer in alley at rear <br />of his building at St. Joseph Street. The Board advised Mr. Hardy that this permit <br />was still goad. _ <br />Slutsky Plumber appeared before the Board in regard to an <br />:rror giving him by the City in the measuring, for: &. sewer tap at 907 Thomas Street <br />and requested the City to pay for the re la id ing of the extra pavement taken up. The <br />Board agreed to pay for same. <br />Mr H. A. Wood met with tha Board in regard tp Marqutte Park <br />Lights. The Board instructed the Clerk to take this matter up with Mr. F. h.' Dennis <br />of the Indiana & Michigan Electric Company and have report Wednesday September 17th., <br />1919 at 7:15 P.M. <br />Mr. Hagedorn of Hagedorn and' Webster appeared before the Board <br />in regard to new add it ion to his building on E. Jefferson Blvd. The Board advised <br />Mr. Hagedern to appear before them at 10:00 A.M. Wednesday September 17th.,1919. <br />The Board agreed to pay for ;;the relaying of the pavement in <br />front of the Weber property on Keasey Street, cut into for the locating of a water tap. <br />The Board instructed Mr. Layton to investigate this cut. <br />The Board ordered that the salary of Mrs. Jessie Winchell clerk <br />in the Building Department be increased from $80.00 pait month to $100.00 per month, same <br />-; ff ec t ive from September 15th. ,1919. <br />Petition received, read and placed on file for electric lights <br />on North Meade Street between Lincoln Way West and Elwood Avenue and one at Calhoun <br />Street and Humboldt Street. <br />