Laserfiche WebLink
176, <br />Tuesday September 16th.,1919. <br />u <br />Board met in regular session at 10:00 A M. Mr. Harvey F. Restiat <br />absent. <br />Bids were received, opened and read for the following <br />Improvements. <br />Resurfacing ofpavement on Van Buren Street and Lawndale Ave. <br />p <br />Bid of the Highways Material Company. <br />` Patching holes and surface treating with asphalt or tar with <br />stone or slag chips. <br />For patch holes and surface treating with Trinidad Asphalt <br />"A" or "C"... .pet•.sq..yd........ .47 <br />Sane with tar .49 <br />Resetting inlets, each... ...... .......................3,50 <br />Resetting manholes covers, each ......................» 3.50 <br />Check for 1, 300.00 <br />Resurfacing pavement on Eddy Street,' <br />Bid of the Highways Material Company. <br />Patching holes and surface treat ing with asphalt �rcta�r- <br />with stone or slag chips. <br />To patch holes and surface treating with Trinidad Asphalt <br />A" or "C" per sq. yd.......... $ .47 <br />Sane with tar preparation per.sq. yd..... *49 <br />Resetting inleta, each..... .............. 3.50 <br />Resetting_ manhole covers, each........... 3.50 <br />Pavement on Haney Avenue from Michigan Street to High St. <br />Bid of the Western Construction Company. <br />Curb per lin ft.............. ...........$ .40 <br />GrafIng per cu. yd....................... 1.20 <br />Asphalt per sq. yd.... 2.98 <br />For Asphaltic concrete using Trinidad <br />Lake Asphalt,' per sq. yd... 2.77 <br />8 inch conduit per lin ft....... . ...... . 1.00 <br />Storm water inlets, each................010000 <br />Marginal curb, per lin ft........ ........ .20 <br />Resetting inlets, each ................... 2.00 <br />Resetting manhole covers, each........... 2.00 <br />Check for $1000. 00 <br />Bid of the White Construction Company. <br />Walk per sq. ft............ 0 ........$ .15 <br />curb per lin ft... .40 <br />Grading per cu. yd.................... .. .98 <br />Sheet asphalt persq. yd... Trtuldadi..... 2.78 <br />Asphaltic concrete, per jj I.... 2.54 <br />8 inch conduit pipe, per lin ft....... .. .80 <br />Storm water inlets, each... !... ...0.90010 •00 <br />Marginal curb, per lin ft................. .20 <br />Resetting inlets, each-* ............. ...2.50 <br />Resetting manholes covers, each..,........2.50 <br />Check for $1,000.00 <br />