My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/03/1919 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1919
>
09/03/1919 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 2:54:00 PM
Creation date
10/23/2018 9:47:24 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
9/3/1919
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1660 <br />BOA,rd met in e ule,r Bess ion at 7: 15' P.M. ?fir. G. A. E 11lett <br />absent. <br />Hearing had on. assessment roll and find: estimate for pavement on <br />Allen Street from Van. Buren Street to Portage Avenue, u_ador Improvement Resolution. <br />No. 667. T-n the City of. South.. Bend , Tr..d iaana <br />$' Tn. they above matter a remonstrator &,,pe ,red but no written rem -en- <br />stra ace was filed. The Board therefore find that the property assessed in said <br />roll filed August 13th.,1919 is bon.efitt*d In the amount of assessments as shown <br />on said assessment roll and the Beard `further rind that the assessment roll f iLed <br />September 3rd. ,1919 and the final estimate allowed September 3rd.,1919 should be <br />and the same are hereby in alL things, ratified, confirmed and 'a' roved. <br />Deferred hearing had on resolution for the resurfaeing of North <br />Michigan Street from North Sher* Drive to Wakewa Avenue, under Improvement Rosolu-- <br />t Ion No- 717. In the City of South Bend, Indiana. <br />Upon said hearing no romen. stratorss appeared and no written <br />remonstaaance was filed. And the Board being fully advised in the premises, decides <br />that the benefits to property liable to be assessed for said improvement are equal <br />to the estimated crest of the same, as reported by the City Civil Eng 1soor, and <br />theroupoa takes fi.naL a etion on said resolution as originally adopted, and t,h*� <br />same is hereby in a1L things, ratified, confirmed and approved. • <br />Resolved further, that notices be published on the 6th,m day of <br />September 1919 and on the 13th., day of Se-atemb*x 1919 in a newspaper of General <br />Circulation in said City, stating that this Hoard will receive bids for the construe <br />t ia;:n of said improvement up to 10: 00 A.M. on the 23rd. day of September 1919 <br />The Hoard reserves the right to reject any and all bids. <br />The following bond and contract approved.. <br />PU131LIC IMPROVEMENT CONTRACT. <br />This Agreement, bade and entered into this 3rd. day of September <br />1919 by and between Harry N. Barnes of the C©unuy of St. Joseph, and State of. <br />Indiana ( hereinafter referred to as the " Contradtar"), and the City of *South Beni <br />in the County of St. Joseph, and State of Indian , by and through its Board of Publi <br />Works, (hereinafter referred to as the " City") under and by virtue of an Act of the <br />General Assembly of the State of Indiana, entitled " An Act Concerning Municipal <br />Corporations, " approved March 6,19059 wad all e.men.datory and supplemental act$ <br />thereto: w <br />Witnesseth, that the: contractor covenants and agrees to <br />construct pavement on at ley north of Mearce Streit from Follows Street to Lincela <br />Way East in the City of South Bend, Indiana at and for the foLlowing prices:- <br />153 eu. yds. of grading per Qu. yd:.....6...660004 192.6 <br />conduit pipe, per lin ft....... .00 <br />manholes reset, *ache**.*. 3.00 <br />i <br />395 sq. yds. of 7 inch esacrtte pavement per sq. <br />yae.rd....... 2.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.