My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/05/1919 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1919
>
08/05/1919 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 2:42:01 PM
Creation date
10/18/2018 1:48:06 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
8/5/1919
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i <br />88 <br />Tuesday'Auaust 5th.,1919. <br />Board met In regular sees ion at. 10:00 A.M. <br />All members <br />pPls ant. v <br />Bids were received, opened and 'read for the following <br />imppovementa. <br />PAVMMT ON HURON STREET PROM Meade STREET TO FIRST ALLEY <br />EAST OP KOSCIUSZKO STREET under ImprovementResolution No. 689, <br />Bid of The Williston Construction Company, <br />curbing per lin ft.......................$.35 <br />Grading per cu. yds. .........•.•........1,05 <br />Trinidad Lake Asphalt pavement per sq. Yd.2.79 <br />Sheet Asphalt Mexican , per sq. yd• ...... <br />2.65. <br />Asphaltic concrete Trinidad Lake <br />aspbalt pavement ;per sq. yd........ <br />2.46 <br />Asphaltic concrete, Mexican Asphalt <br />pavement, per sq. yd..,••.;.•.••..••.• <br />2.35 <br />flinch conduit pipe, per lin ft........... <br />.90 <br />Storm water inlets, <br />10.00 <br />Marginal curb, per tin ft................. <br />.35 <br />Resetting Inlets, each........;, ......oboe. <br />3.00 <br />Resenting manhole covers, each....,........ <br />3.00 <br />Check for 24.00 <br />Bid of the White Contruct ion Company <br />Walk per sq. ft.........►.....�•.,....••. <br />.15 <br />cement curb, per lin ft.......�.....,..... <br />.4o <br />Grading per cub yd............ j, .......... <br />1.40 <br />Asphalt roadway Trinidad Lske or sq. yd, <br />2.73 <br />Standard Mexican Asphalt pavemont per sq. <br />yd._.... <br />2.62 <br />Asphaltic concrete pavement , <br />.T <br />.Trinidad Lake Asphalt per q. yd..... <br />2.45 <br />Asphaltic concrete, Standard M x iean <br />asphalt, per sq. yd........... <br />2.32 <br />8 inch conduit pipe, per lin f .....boob. <br />.80 <br />Storm water inlets, each................. <br />10.00 <br />Marginal curb, per tin ft. • .... • .... • • . •.. <br />.20 <br />Resetting inlets, eQeh........ ........... <br />2.50 <br />Resetting manhole covers, each ........... <br />2.50 <br />Check for $924.130 <br />Bid of the Western Construction Co. <br />Walk per aq.-ft............... ..........$ <br />.20 <br />curbing per lin ft.. * * • .: :. . • . .. • ....:... <br />• 40 <br />Grading per cu. yd........................ <br />1,25 <br />.Trinidad Lake Asphalt pavement per sq. yd. <br />2.75 <br />8 inch a bnduit pipe, per 11n ..... • . • • .. <br />*go <br />Storm water inlets, each• ..... ........... <br />10.00 <br />Margin& leurb per lin ft...... .•••••••••• <br />,20 <br />Resetting inlets, each. ....... ......•.... <br />2.50 <br />Resetting manhole covers, each ........... <br />2.50 <br />Check for $924 00 <br />-- A.— <br />
The URL can be used to link to this page
Your browser does not support the video tag.