Laserfiche WebLink
� � � rm100lpr� <br />� r '11yUJJllll� r <br />01010111m I a LIN &XIISILT1 <br />l 11 �L l►4 � \ _I <br />FOR <br />PROFESSIONAL O SERVICES <br />THIS IS AN AGREEMENT effective as of October 9, 2018 ("Effective bale") between. <br />Board of Public "Forks, City of South. Bend, Indiana ("Owner") and <br />Abonmarche Consultants Inc. ("Engineer") <br />Owner's Project, of which Engineer's services under this Agreement are a part, is generally identified as <br />follows: <br />Fellows & Ewing Intersection Signal Replacement - Cily Project No. 118-097 ("Project"). <br />Engineer's Services under this Agreement are generally identified as follows: <br />Design and prepare Construction Documents for a traffic signal to replace the existing signal at the <br />intersection of Fellows Street and Ewing Street. <br />Owner and Engineer further agree as follows: <br />1.01 Basic Agreement and Period ofService <br />A. Engineer shall provide, or cause to be provided, the services set forth in this Agreement. If <br />authorized by Owner, or if required because of changes in the Project, Engineer shall furnish <br />services in addition to those set forth above. Owner shall pay Engineer for its services as set forth in <br />Paragraphs 7.01 and 7.02. <br />B. Engineer shall complete its services within a reasonable time, or within the following specific time <br />period: <br />1. Preliminary Plans within 4 weeks of authorization, <br />2. Final Plans within 3 weeks after Preliminary (Plans. <br />C. If the Project includes construction -related professional services, then Engineer's time for <br />completion of services is conditioned on the time for Owner and its contractors to complete <br />Page 1 <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional services <br />Copyright C 2008 National society of Professional Engineers for EACDC, All; rights reserved. <br />