My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Emergency Services Agreement - Belfor USA Group Inc - Installation of Hanging Nets around Damaged Plaster at MPAC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Agreements, Contracts, Proposals
>
Emergency Services Agreement - Belfor USA Group Inc - Installation of Hanging Nets around Damaged Plaster at MPAC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 8:46:45 AM
Creation date
10/10/2018 3:01:51 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
10/9/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
13ELFOR t0j <br />PROPERTY RESTORATION <br />(BELFOR USA GROUP, INC.), <br />CONTRACTOR'S LICENSE # <br />SERVICES AGREEMENT <br />This Services Agreement (this "Agreement") is made and entered into on September 18 , 2018 between BELFOR <br />USA Group, Inc., dba BELFOR Property Restoration, a Colorado corporation ("Contractor") with its principal place of <br />business at 185 Oakland Avenue, Suite 150, Birmingham, MI 480�09 and City of South Bend with its principal place of <br />business at 227 W. Jefferson Blvd., South Bend, IN 46601-.12Q2.J" Owner"), Owner and Contractor may be referred to <br />throughout individually as a "Party," or together as the "Pat -ties." <br />RECITALS: <br />WHERE, AS, Contractor is a service contractor engaged in the business of supplying emergency response, disaster <br />restoration, reconstruction and related services, necessitated by fire, water, wind, smoke, Contamination, corrosion and any <br />other natural or rnanmade disaster. <br />WHERE, AS, Owner's Property suffered damages as a result of falling plaster —. Owner desires to hire Contractor <br />to perform professional services with respect to Owners property located at 211 N. Michigan St., South Bend, IN 46601 - <br />1202 ("Property"). Contractor shall furnish all labor, materials, tools, equipment and supervision necessary to Perform the <br />Work (as defined in Section 2). <br />NOW, THEREFORE, in consideration of the premises and the mutual covenants and agreements of the parties, the <br />sufficiency of which is hereby acknowledged, the Parties agree as follows: <br />SECTION 1. TERM OF AGREEMENT <br />Work shall commence on__ September 19,-2018 ("Commencement Date"). The Contractor shall achieve Substantial <br />Completion no later than __J!1-5ey�enDa�Sfrorn the Commencement Date, subject to adjustment or early termination as <br />provided herein. Substantial Completion is the stage in the progress of the Work when the Work or designated portion thereof <br />is sufficiently complete in accordance with the Contract so that the Owner can occupy or utilize the Work for its intended use. <br />Parties agree that Contractor shall order the building materials only upon the execution of this Agreement, therefor; Owner's <br />delay in signing this Agreement shall not be included in calculating time frames for payment or performance obligations. <br />Contractor shall not be liable for any failure or delay in the performance of its obligations under this Agreement for the period <br />that such failure or delay is beyond Contractor's control. <br />SECTION 2. SCOPE OF WORK, <br />The scope of work under this Agreement concerns restoration services to the Property for damages caused by a <br />Falling Plaster . The itemized list of the Work to be done is limited to the installation of hanging nets around plaste <br />cornices ,.to,.,guard against additional falling plaster. Contractor shall provide wenches to lift and hold Owner supplied nets in <br />place. Contractor shall cover and protect The cost thereof is agreed to by the Parties as Rate & Material. The <br />Contractor shall assume no liability and shall be Held Harmless by the Owner and Structure Point Engineering for any and <br />all recourse, damage, or injury as a result of this action. Contractor further agrees to perform the Work in good and <br />workmanlike manner, and in accordance with industry standards established by those engaged in a business similar to that of <br />the Contractor. <br />SECTION 3. CONTRACTOR'S COMPENSATION. <br />3.1 Conti -act Sum. The Owner shall pay the Contractor the Contract Sum in current funds for the Contractor's <br />performance of the Contract, 'rho Contract Sum shall be one of the following: <br />V. 1 3118 <br />Page 1 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.