Laserfiche WebLink
(6) The construction of the Howard Park Wall Project consisting <br />of the removal and replacement of the existing wall bordering Howard <br />Park and the St. Joseph River for a distance of approximately 1,000 <br />linear feet including the capping of the foundation of the existing <br />wall, the installation of riprap along the base of the wall and the <br />construction of a new four feet high wall and repair and /or <br />replacement of the walkway along the wall and appurtenant work, such <br />construction and related improvements to be made to the following <br />described real estate acquired or to be acquired by the Authority: <br />Commencing at the northwest corner of Lot 4 in Heck's <br />Addition, also situated in the west half (1/2) of the <br />northeast quarter (1/4) of Section Twelve (12), <br />r Township 37 north, Range 2 east; thence southeast along <br />the east side of the St. Joseph River for approximately <br />1200 feet to the southeast corner of Lot 19, thence <br />north for 20 feet, thence northwest parallel to the <br />east side of the St. Joseph River for approximately <br />1200 feet, the north line of Lot 4, thence west for 20 <br />feet back to the point of beginning. <br />