My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - WWTP Bank Stabilization Phase 2 - Selge Construction Co Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Opening of Quotations/Proposals
>
Opening of Quotes - WWTP Bank Stabilization Phase 2 - Selge Construction Co Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 9:46:53 AM
Creation date
9/27/2018 10:40:55 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/25/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PROJECT NAME: <br />PROJECT NO. <br />QUOTES DUE <br />Wastewater Treatment Plant Bank Stabilization Phase 2 <br />ME <br />September 25, 2018 <br />(Must be completed for all quotes. Please type or print) <br />Date: 9/25/18 Firm: ;3el e Construction Co., Inc. <br />Address: 2833 S. 11th street <br />City/State/Zip: Niles, MI 49120 Telephone Number: _( 269 ) 684-0842 <br />Agent of Bidder (if Applicable): <br />Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the <br />public works project of: <br />Masi Treatment Plant Bank ink—Stab-ilization Phase 2 <br />the City of South Bend, Indiana, in accordance with plans and specifications prepared by: <br />The City of South Bend, Department of Public Works & Cardno <br />and dated 2018 for the sum of (enter the Total Quote as shown an the Proposal) <br />One Hundr s & �_50, 660. 50 <br />(Enter Sum of Total Quote plus Alternates shown on ProposalI)Fifty Cents. (Numerical) <br />If alternative quotes apply, the undersigned submits a proposal for each in accordance with the notice. Any <br />addendurns attached will be specifically referenced at the applicable page. <br />If additional units of material included in the contract are needed, the cost of units must be the same as that shown <br />in the original contract if accepted by the City of South Bend, If the quote is to be awarded on a unit basis, the <br />itemization of the units shall be shown on a separate attachment. <br />The above quote is accepted this <br />Subject to the following conditions,, <br />[*019NEKE=11-41141TIT141-0 <br />Gary A. Gilot, President <br />Elizabeth A. Maradik, Member <br />James A. Mueller, Member <br />Version 1,0/18/2016 <br />'y <br />(Signature) <br />Robert Kuhns, Project Engineer <br />(Printed Name of Person Signing) <br />ACCEPTANCE <br />day of <br />20 <br />Suzanna M. Fritzberg, Member <br />Therese J. Dorau, Member <br />Attest: Linda M. Martin, Clerk <br />Page - 7 Public Works Quote <br />
The URL can be used to link to this page
Your browser does not support the video tag.