Laserfiche WebLink
22. In the following chart please indicate companies that were used for purchasing materials used in the construction or <br />rehabilitation associated with the project. Include the location of the company, description of the materials, and cost of <br />the materials. Additional information may be requested for verification of this information. (If more space is needed, <br />please photocopy this page) <br />Name and Address of Company Description of Materials Cost of Materials <br /> <br />~ ~ <br /> c <br />r~ z <br />~, <br />~z N <br />- ~ <br />o° ~ <br />v <br /> <br />~~ o <br /> Mid-State Construction, Inc. Pre-engineered Metal Building Approximately $300, 000 <br /> 53697 CR 9 North Erected on a concrete slab with 2 feet <br /> PO Box 667 Masonry on all non-expandable side; . <br /> Elkhart, IN 4651 S Includes fire protection, & mechanical and <br /> Electrical fixtures. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />m <br /> <br /> <br /> <br /> <br />o cs~ <br />ra. <br />a _": <br />C~ <br />