Laserfiche WebLink
5 YEAR <br />10-May-06 <br />GARDEN HOMES <br />South Bend Portage Township Residential Real Property Tax Abatement Schedule* <br />Estimated Project Cost: <br />Assessed Value: <br />STRUCTURE (assume 85% of project cost): <br />LAND (assume $10,000): <br />Gross Assessed Value: <br />Less Mortgage Exemption: <br />Less Standard Homeowners Deduction: <br />Base Assessed Value: <br />Base Assessed Value: <br />Less Maximum Abatement Deduction: <br />Less Non-Abated Amount: <br />Plus Land Assessed Value: <br />Net Assessed Value: <br />Proaerty Taxes: <br />Assume constant tax rate of: <br />Gross Tax (tax rate x net assessed value): <br />Less SRTC (21.6113%): <br />Less Homestead Credit (24.3982%): <br />Net Tax: <br />$125,000.00 <br />Total Taxes Tax Abated** Tax Paid*** <br />106, 250.00 106, 250.00 106, 250.00 <br />10.000.00 N/A N/A <br />116,250.00 106,250.00 106,250.00 <br />(3,000.00) (3,000.00) (3,000.00) <br />(35,000.00) (35,000.00) (35,000.00) <br />78,250.00 68,250.00 68,250.00 <br />78,250.00 68,250.00 68,250.00 <br />N/A N/A ($74,600.00) <br />N/A 6,350.00 N/A <br />N/A N/A 10,000.00 <br />78,250.00 74,600.00 3,650.00 <br />4.89060% 4.89060% 4.89060% <br />3,826.89 3,648.39 178.51 <br />(827.04) (788.46) (38.58) <br />(731.91) (697.77) (34.14) <br />2.267.94 2.162.16 105.79 <br />Net Assessed Total <br />Year Value Taxes Due Tax Abated Tax Paid <br />1 78,250.00 2,267.94 2,162.16 105.79 <br />2 78,250.00 2,267.94 2,162.16 105.79 <br />3 78,250.00 2,267.94 2,162.16 105.79 <br />4 78,250.00 2,267.94 2,162.16 105.79 <br />5 78,250.00 2,267.94 2,162.16 105.79 <br /> 5 year totals: 11,339.70 10,810.80 528.95 <br />*This schedule is for estimation purposes only and assumes constant tax rates. <br />The true tax values will ultimately be determined by the actual ~ <br />assessed valuation and the then current tax rates. E,~~~ <br />**Tax Abated is capped at $74,600 of assessed value of structures only ~P: <br />,;.r <br />and does not include land assessed value. t; <br />~~~'~ <br />***Tax Paid is calculated using the difference between actual assessed value , ~,~ `~~ <br />of structure and maximum abated portion of $74,600 and adding ~ ,'° ~ <br />back the land assessed value. ~~' ~ !~' <br />~ ~ ~ <br />a <br />:. ~~ <br />A~~ ~v° <br />~J~~. <br />A,, <br />U~~ <br />