Laserfiche WebLink
Project Name <br />Project No. <br />For Bids Due <br />so <br />BIDIPROPOSAL <br />CITY OF SOUTH BEND <br />JC Lauber Site Improvements <br />11118-083B <br />September 20, 2018 <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />MOBILIZATION/DEMOBILIZATION <br />I <br />LS <br />$ 36,717.00 <br />$ 36,717.00 <br />2 <br />CONSTRUCTION ENGINEERING <br />I <br />LS <br />$ 8,379.00 <br />$ 8,379.00 <br />MAINTENANCE OF TRAFFIC: <br />3 <br />SIGNAGE, BARRICADES <br />1 <br />LS <br />DETOUR, ETC. INCLUDING <br />PERMIT FEES <br />$ 5,603.010 <br />$ 5,603.00 <br />4 <br />NILES AVE. PAVEMENT <br />169 <br />SY <br />REMOVAL <br />I$ 45.00 <br />$ 7,605-00 <br />4A <br />NILES AVE, PAVEMENT <br />169 <br />SY <br />� <br />REPLACEMENT <br />$ 99.00 <br />$ 16,731.00 <br />COMMERCIAL DRIVEWAY <br />37 <br />SY <br />� <br />REMOVAL <br />$ 28.00 <br />$ 1,036.00 <br />5A <br />COMMERCIAL DRIVEWAY <br />37 <br />SY <br />REPLACEMENT <br />$ 178.00 <br />$ 6,586.00 <br />6 <br />STD. SIDEWALK REMOVAL <br />20 <br />SY <br />$ 20.00 <br />$ 400.00 <br />6A <br />STD, SIDEWALK REPLACEMENT <br />20 <br />SY <br />$ 6,6.00 <br />$ 1,320.00 <br />PERVIOUS CONCRETE <br />7 <br />SIDEWALK REPLACEMENT (IF <br />100 <br />SY <br />REQ'D) <br />$ 72= <br />$ 7,200.00 <br />8 <br />ON! -SITE PAVEMENT REMOVAL <br />160 <br />SY <br />$ 119.00 <br />$ 19,040.00 <br />8A <br />ON -SITE PAVEMENT <br />160 <br />SY <br />REPLACEMENT <br />$ 54.00 <br />$ 8,640.00 <br />CUT EXISTING SANITARY <br />9 <br />LATERAL & HOOK UP NEW <br />1 <br />LS <br />LATERAL INCLUDING TAP FEES. <br />$ 2,037.00 <br />$ 2,037.00 <br />10 <br />4" SANITARY LATERAL <br />20 <br />LF <br />$ 61.00 <br />$ 1,220.00 <br />11 <br />6" SANITARY LATERAL <br />90 <br />LF <br />$ 51.00 <br />$ 4,590.00 <br />12 <br />1,000 GAL, GREASE TRAP <br />I <br />LS <br />$ 6,723.00 <br />$ 6,723.00 <br />13 <br />SEWER CLEAN -OUT <br />3 <br />EA <br />$ 645.00 <br />$ 1,935.00 <br />14 <br />3" WATER TAP IN EXISTING <br />1 <br />EA <br />MAIN, INCLUDING TAP FEES <br />$ 1,732.00 <br />$ 1,732.00 <br />115 <br />6" WATER TAP IN EXISTING <br />1 <br />EA <br />MAIN, INCLUDING TAP FEES <br />$ 2,649.00 <br />$ 2,649.00 <br />