My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
No. 2971 approving/authorizing the execution of an amendment to the addendum to the Master Agency Agreement (Mayflower/Hutsfield Square Infrastructure Project) (relates to 2893-11)
sbend
>
Public
>
Redevelopment Commission
>
Resolutions
>
No. 2971 approving/authorizing the execution of an amendment to the addendum to the Master Agency Agreement (Mayflower/Hutsfield Square Infrastructure Project) (relates to 2893-11)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2012 11:39:02 AM
Creation date
1/11/2012 2:54:39 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
O <br />June 2011 <br />City of South Bend <br />Proposal for Engineering Services <br />Construction Inspection Mayflower Road Sanitary Sewer and Relocation Page 3 <br />materials complete in place in accordance with the contract. <br />12) Project Responsibility: The Resident Project Representative will be responsible for the <br />documentation of pay quantities and estimates, and the maintenance of <br />appropriate records related to the construction of this project. <br />13) Work Schedule and Suspension: The Abonmarche crew will be required to regulate <br />their work week to conform to the Contractor's hours in accordance with the <br />directions of the Construction Engineer. If work on the construction project is <br />suspended and all matters concerning contract compliance and administration are <br />complete, the services of the consultant may also be suspended without cost to the <br />project. <br />APPENDIX B <br />ANTICIPATED SCHEDULE <br />The consultant will be prepared to begin the work under this agreement within five (5) <br />days after a letter of notification to proceed is received from the local public agency. <br />The consultant shall complete and deliver the final construction record and final estimate <br />to the Construction Engineer within forty -five (45) calendar days after the Contractor's last <br />day of work. <br />Engineers Architects Planners Surveyors <br />
The URL can be used to link to this page
Your browser does not support the video tag.