My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
No. 2970 approving/authorizing the execution of an addendum to the Master Agency Agreement (Ignition Park Phase 1B Infrastructure)
sbend
>
Public
>
Redevelopment Commission
>
Resolutions
>
No. 2970 approving/authorizing the execution of an addendum to the Master Agency Agreement (Ignition Park Phase 1B Infrastructure)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2012 11:39:19 AM
Creation date
1/11/2012 2:48:54 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SOUTH BEND ECONOMIC DEVELOPMENT 04 October 2011 <br />South Bend, Indiana <br />Ignition Park Master Planning <br />BSA LifeStructures #15350001 Page 1 <br />IGNITION PARK <br />Phase 1 B — Scope of Work: <br />Intent of this work is to provide the basic site infrastructure to establish Ignition Park access for <br />vehicles, pedestrians and other transients, establish easements and accesses to develop the future <br />image of Ignition Park and prepare the site for the first accelerator building development. <br />SITE IMPROVEMENTS <br />A. Sample Street boulevard extension to Circle Drive. This will include all improvements, <br />landscaping, lighting, storm drainage and rain gardens <br />B. Extend the Stull Street boulevard south lane. This will include all improvements, <br />landscaping, lighting, storm drainage and rain gardens <br />C. Complete Circle Drive with canal, walk and center park area. <br />D. Construct the East and West Greenways with all improvements, landscaping, lighting, <br />canal and walks <br />E. Grade and install native plantings throughout undeveloped parcels. <br />APT-1 <br />SITE UTILITIES <br />• Electric: Power for parcels will be distributed by local utility company. Common area <br />power will be central metered. <br />• Communication conduit system. <br />• Rain Water Harvesting: Install rain water harvesting system throughout the campus <br />which includes canals, underground box storage culverts, collection pond, and pumping <br />system. <br />• Sanitary: Install sanitary system along roadways to adequate city sewer. <br />• Storm: Install storm sewer collection system to rain water harvesting system. <br />• Water: Water main to be extended to include adequate fire protection and hydrant <br />locations for public safety. <br />
The URL can be used to link to this page
Your browser does not support the video tag.