Laserfiche WebLink
G <br />N <br />14 <br />9of11 <br />Supplemental Agreement No. 2 <br />Description <br />Original <br />SA # 1 <br />SA # 2 <br />New Total <br />Amount <br />a. <br />Field Survey (including <br />Route Surve Plat <br />$73,000.00 <br />$10,000.00 <br />$18,700.00 <br />$101,700.00 <br />b 1. <br />Preliminary Roadway Design <br />and Plans 20% Complete) <br />$82,000.00 <br />- $28,700.00 <br />$0.00 <br />$53,300.00 <br />b 2. <br />Bid Package 1 <br />$0.00 <br />$202,000.00 <br />$0.00 <br />$202,000.00 <br />C. <br />Maintenance of Traffic <br />Concepts <br />$8,000.00 <br />- $4,000.00 <br />$0.00 <br />$4,000.00 <br />d. <br />Public Information Meeting, <br />Hourly Rate, as required <br />$6,000.00 <br />$0.00 <br />$0.00 <br />$6,000.00 <br />e. <br />Conceptual Traffic Signal <br />Design <br />$20,500.00 <br />- $8,200.00 <br />$0.00 <br />$12,300.00 <br />f. <br />Utility Coordination, <br />Hourly Rate, as required <br />$8,000.00 <br />$2,000.00 <br />$5,000.00 <br />$15,000.00 <br />g. <br />Coordination with <br />Memorial Hospital and <br />INDOT, Hourly Rate, as <br />required <br />$10,000.00 <br />$2,500.00 <br />$2,500.00 <br />$15,000.00 <br />h. <br />R/W Engineering (4 Parcels <br />@$2,700 per Parcel), if <br />required <br />$27,000.00 <br />- $10,800.00 <br />.- $5,400.00 <br />$10,800.00 <br />i. <br />Title Abstracting (4 Parcels <br />@ $325 per Parcel), if <br />re uired* <br />$3,250.00 <br />- $1,300.00 <br />0.00 <br />$1,950.00 <br />Geotechnical Evaluation <br />$7,500.00 <br />$0.00 <br />$15,000.00 <br />$22,500.00 <br />k. <br />Bid Package 2 <br />$0.00 <br />$48,000.00 <br />$0.00 <br />$48,000.00 <br />1. <br />Bid Package 3 <br />$0.00 <br />$0.00 <br />$130,000.00 <br />$130,000.00 <br />M. <br />Bid Package 4 <br />$0.00 <br />$0.00 <br />$90,000.00 <br />$90,000.00 <br />n 1. <br />Subsurface Utility <br />Engineering SUE Area 1 <br />$0.00 <br />$0.00 <br />$11,360.00 <br />$11,360.00 <br />n 2. <br />Subsurface Utility <br />Engineering SUE Area 2 <br />$0.00 <br />$0.00 <br />$11,360.00 <br />$11,360.00 <br />n 3. <br />Subsurface Utility <br />Engineering SUE Area 3 <br />$0.00 <br />$0.00 <br />$24,180.00 <br />$24,180.00 <br />o. <br />Right of Way Dedication <br />Plat <br />$0.00 <br />$0.00 <br />$10,000.00 <br />$10,000.00 <br />p. <br />Bid Phase, Pre <br />Construction Meeting and <br />Construction Phase Office <br />Services, Hourly Rate, as <br />required <br />$0.001 <br />$0.00 1 <br />$8,000.00 1 <br />$8,000.00 <br />$245,250.00 <br />$211,500-001 <br />$320,700.001 <br />$777,450.00 <br />9of11 <br />Supplemental Agreement No. 2 <br />