<br />Supplemental Agreement No. 2 
<br />Description 
<br />Original 
<br />SA # 1 
<br />SA # 2 
<br />New Total 
<br />Amount 
<br />a. 
<br />Field Survey (including 
<br />Route Surve Plat 
<br />$73,000.00 
<br />$10,000.00 
<br />$18,700.00 
<br />$101,700.00 
<br />b 1. 
<br />Preliminary Roadway Design 
<br />and Plans 20% Complete) 
<br />$82,000.00 
<br />- $28,700.00 
<br />$0.00 
<br />$53,300.00 
<br />b 2. 
<br />Bid Package 1 
<br />$0.00 
<br />$202,000.00 
<br />$0.00 
<br />$202,000.00 
<br />C. 
<br />Maintenance of Traffic 
<br />Concepts 
<br />$8,000.00 
<br />- $4,000.00 
<br />$0.00 
<br />$4,000.00 
<br />d. 
<br />Public Information Meeting, 
<br />Hourly Rate, as required 
<br />$6,000.00 
<br />$0.00 
<br />$0.00 
<br />$6,000.00 
<br />e. 
<br />Conceptual Traffic Signal 
<br />Design 
<br />$20,500.00 
<br />- $8,200.00 
<br />$0.00 
<br />$12,300.00 
<br />f. 
<br />Utility Coordination, 
<br />Hourly Rate, as required 
<br />$8,000.00 
<br />$2,000.00 
<br />$5,000.00 
<br />$15,000.00 
<br />g. 
<br />Coordination with 
<br />Memorial Hospital and 
<br />INDOT, Hourly Rate, as 
<br />required 
<br />$10,000.00 
<br />$2,500.00 
<br />$2,500.00 
<br />$15,000.00 
<br />h. 
<br />R/W Engineering (4 Parcels 
<br />@$2,700 per Parcel), if 
<br />required 
<br />$27,000.00 
<br />- $10,800.00 
<br />.- $5,400.00 
<br />$10,800.00 
<br />i. 
<br />Title Abstracting (4 Parcels 
<br />@ $325 per Parcel), if 
<br />re uired* 
<br />$3,250.00 
<br />- $1,300.00 
<br />0.00 
<br />$1,950.00 
<br />Geotechnical Evaluation 
<br />$7,500.00 
<br />$0.00 
<br />$15,000.00 
<br />$22,500.00 
<br />k. 
<br />Bid Package 2 
<br />$0.00 
<br />$48,000.00 
<br />$0.00 
<br />$48,000.00 
<br />1. 
<br />Bid Package 3 
<br />$0.00 
<br />$0.00 
<br />$130,000.00 
<br />$130,000.00 
<br />M. 
<br />Bid Package 4 
<br />$0.00 
<br />$0.00 
<br />$90,000.00 
<br />$90,000.00 
<br />n 1. 
<br />Subsurface Utility 
<br />Engineering SUE Area 1 
<br />$0.00 
<br />$0.00 
<br />$11,360.00 
<br />$11,360.00 
<br />n 2. 
<br />Subsurface Utility 
<br />Engineering SUE Area 2 
<br />$0.00 
<br />$0.00 
<br />$11,360.00 
<br />$11,360.00 
<br />n 3. 
<br />Subsurface Utility 
<br />Engineering SUE Area 3 
<br />$0.00 
<br />$0.00 
<br />$24,180.00 
<br />$24,180.00 
<br />o. 
<br />Right of Way Dedication 
<br />Plat 
<br />$0.00 
<br />$0.00 
<br />$10,000.00 
<br />$10,000.00 
<br />p. 
<br />Bid Phase, Pre 
<br />Construction Meeting and 
<br />Construction Phase Office 
<br />Services, Hourly Rate, as 
<br />required 
<br />$0.001 
<br />$0.00 1 
<br />$8,000.00 1 
<br />$8,000.00 
<br />$245,250.00 
<br />$211,500-001 
<br />$320,700.001 
<br />$777,450.00 
<br />9of11 
<br />Supplemental Agreement No. 2 
<br /> |