VII. Add Section E to Appendix "C" as follows: <br />E. Bid Package 3 Field Survey complete within 21 days and Bid Package 4 <br />Field Survey complete within 75 days after receipt of notice to proceed for <br />both Bid Packages 3 and 4. <br />VIII. Add Section F to Appendix "C" as follows: <br />F. Bid Package 3 <br />1. Preliminary Plans within 45 calendar days after completion of Field <br />Survey. <br />2. Final Plans within 30 calendar days after approval of Preliminary <br />Plans, includes 7 calendar days of OWNER review time. <br />7 of 11 <br />Supplemental Agreement No. 2 <br />2. The ENGINEER shall prepare and submit the application and back -up <br />documentation for the following permits, as required. <br />a. Rule 5 - Erosion Control. <br />i. <br />Prepare a Notice of Intent Letter <br />ii, <br />Prepare a Project Location Map <br />iii. <br />Prepare Plan and Profile Sheets and Erosion Control <br />Plans to show existing vegetation, drainage patterns, <br />adjacent land use, storm water discharge locations, <br />ultimate receiving waters, the proposed storm water <br />system, construction details of outlet protection below <br />the storm water outlets and watercourses on and <br />adjacent to the project site. <br />iv. <br />The erosion control plan will show the location, <br />dimensions and construction details for the initial <br />perimeter protection. The plan shall also show the <br />location, dimensions and construction details of all <br />Temporary Erosion Control Measures. <br />V. <br />Provide a plan showing the location, dimensions, and <br />construction details of all Permanent Erosion Control <br />Measures. <br />vi. <br />Provide the specifications and Details for proposed <br />Storm Inlet Protection, Stable construction entrances <br />and erosion and sediment control on individual lots, as <br />required. <br />vii. <br />Provide maps showing the Floodplains, Floodways, and <br />Floodway Fringes. <br />viii. <br />Determine soil types within the project area. <br />ix. <br />Provide a schedule when disturbed areas will be <br />stabilized and specifications for permanent seeding. <br />X. <br />Delineate the disturbed and preserved areas and <br />proposed locations of soil stockpiles and borrow areas. <br />xi. <br />Complete permit application form. <br />VII. Add Section E to Appendix "C" as follows: <br />E. Bid Package 3 Field Survey complete within 21 days and Bid Package 4 <br />Field Survey complete within 75 days after receipt of notice to proceed for <br />both Bid Packages 3 and 4. <br />VIII. Add Section F to Appendix "C" as follows: <br />F. Bid Package 3 <br />1. Preliminary Plans within 45 calendar days after completion of Field <br />Survey. <br />2. Final Plans within 30 calendar days after approval of Preliminary <br />Plans, includes 7 calendar days of OWNER review time. <br />7 of 11 <br />Supplemental Agreement No. 2 <br />