Laserfiche WebLink
E. If design changes are required during construction due to design errors in the <br />final plans or specifications, the CONSULTANT will make such necessary design <br />changes without additional cost to the OWNER. However, if design changes are <br />required during construction which are occasioned by changed conditions or <br />conditions which could not have been reasonably foreseen by the <br />CONSULTANT prior to construction, the CONSULTANT will be paid for such <br />modifications on the basis of actual hours of work performed by essential <br />personnel exclusively on this contract at the employee hourly rate in accordance <br />with the CONSULTANT's standard fee structure. <br />5. The following items shall be provided by the OWNER or by DSG: <br />A. <br />Schematic Design Drawings including all floor plans, exterior design concepts <br />and exterior building elevations, styles and colors. <br />B. <br />Written outline Performance Specifications describing the engineered systems <br />anticipated to be used for the project. <br />C. <br />Project Literature and Information, including but not limited to live fire training <br />props, smoke systems, sound systems, and high temperature lining materials. <br />D. <br />Preliminary Cost Estimate at Schematic Design Phase. <br />E. <br />Design Development (DD) Drawings at 95% Completion level for the proposed <br />Buildings, internal equipment layout, overall shell building Structural system <br />design concepts and Site improvements. <br />F. <br />Complete Specifications Sections for Training Related elements, including but <br />not limited to Light Systems, Smoke Systems, Computer Controlled Live Fire <br />Props, Ventilation Systems, High Temperature Thermal Lining. <br />G. <br />Mechanical, Electric & Plumbing System Design Criteria and Guidelines, <br />including product literature, cut sheet information and performance design <br />H. <br />Appropriate vendor facility interface drawings, which depict installation <br />requirements for computer controlled live fire props. <br />I. <br />Final construction cost estimate including actual vendor costs and estimates. <br />t <br />6. The following items shall be considered Additional Services and are not included in the <br />scope of work: <br />A. Design of private utility lines (electric, natural gas, telecommunications). <br />B. Design of off -site sanitary sewer or water lines. <br />C. Design of any pumping systems for either storm water or sanitary sewage. <br />D. 31D fly- through or other computer animated materials. <br />E. Wetland mitigation and/or wetland permitting. <br />F. Retaining wall design. <br />G. Full -time on -site construction inspection. <br />A -5 <br />