Laserfiche WebLink
Exhibit "A" <br />Design Services Scope of Work, Schedule and Compengatian <br />1. Project Description <br />A. The project generally includes topographic survey, geotechnical investigation, <br />preliminary site layout, site design, building design (architectural, structural, <br />mechanical, electrical and plumbing) and construction documents, bidding <br />services and construction administration for a new Fire Training <br />Tower /Emergency Response Center for the OWNER. The project will be located <br />on property owned by the St. Joseph Regional Airport Authority (Airport), as <br />depicted in the attached Exhibit "B ". <br />B. The Fire Training Tower /Emergency Response Center will include the following: <br />i. 5 -story Training Tower (approximately 4,400 sq, feet). <br />ii. 2 -story Residential Class "A" Burn Building (approximately 2,100 <br />sq. feet). <br />iii. Outdoor Classroom for Briefing, Debriefing and Breaks (including <br />Storage Area and Rest Room). <br />iv. Access to the site from either Lincolnway West or Blackthorn Golf <br />Club. <br />C. The OWNER anticipates contracting directly with Development Strategies Group <br />(DSG) for certain aspects of this project. <br />2. Scope of Work <br />A. The CONSULTANT will provide a full topographic survey of the area depicted on <br />Exhibit "B ", which is approximately 57 acres of land area. The topographic <br />survey shall include: <br />1. The location and elevation of all visible features, including buildings, <br />paved and gravel surfaces, fences, guardrail, shrubs, signs, poles, <br />manholes, valves and meters, and utility locations marked by others, and <br />all individual trees, except limits only of heavily wooded areas. <br />2. Ground shots on a 50 -foot by 50 -foot grid along with all elevation <br />breaklines. <br />3. The topographic survey will include one -foot contours. <br />4. Coordinate system for the project shall be Indiana State Plane <br />coordinates. <br />5. Three horizontal and vertical control points will be established on the site. <br />B. The CONSULTANT will provide the services of a qualified geotechnical <br />Subconsultant for a geotechnical investigation required for the appropriate design <br />of the site facilities, as defined in item 1.8 of this Exhibit "A ". <br />C. The CONSULTANT will provide the following services: <br />1. The CONSULTANT will prepare a preliminary site plan layout (one initial <br />layout plus up to two revisions) for the Fire Training Tower /Emergency <br />A -1 <br />