Laserfiche WebLink
Ane 22, 2011 <br />City of South Bend <br />Proposal for Engineering Services <br />Nimtz Parkwav A9ulti -use Path Page 1 of 3 <br />APPENDIX "A" <br />Work Plan <br />PROJECT SCOPE <br />The proposed project consists of the design and development of bid documents for the <br />construction of a multi -use path 8 feet in width from the entrance to Blackthorn Golf Course <br />to the west side of Mayflower Road over a distance of 4,400 feet. A rest area will be <br />developed near the golf course 15`I' tee. <br />This project will require field survey, roadway design and landscape design. The topographic <br />survey will survey the area from the south and east curb line to the existing right -of -way line in <br />the areas that were not surveyed previously for the Mayflower Sewer Project. Lighting for the <br />path will be designed to mount on the path side of the existing light poles. <br />SCOPE OF SERVICES <br />The scope of services proposed herein includes the design and development of bid documents <br />for the project and are further described as follows: <br />Task #1: Field Survey <br />(a) Obtain recorded plats, deeds of all adjacent properties, and section line documentation; <br />(b) Obtain utility maps for all of the utilities in the existing right of way; <br />(c) Establish the existing right of ways and set construction control lines. Witness survey <br />horizontal control points; <br />(d) Run benchmark levels circuit setting temporary benchmarks no further than 500 feet <br />apart; <br />(e) Obtain location of existing manholes, storm water inlets and water valves. Detail <br />measure existing manholes to get inverts and sewer sizes; <br />(f) Locate existing utilities that are in the right of ways; <br />(g) Obtain topographic data; <br />(h) Plot the topographic survey and develop existing contours. <br />Task #2: Path Design <br />(a) Prepare plan and profile sheets from the topographic survey; <br />(b) Develop proposed typical sections; <br />(c) Design proposed grades and geometrics; <br />(d) Plot existing and proposed cross sections in all areas at intervals of 50 feet; <br />(e) Design the rest area; <br />CA (f) Prepare preliminary estimate of probable construction costs; <br />(g) Prepare maintenance of traffic plan and construction staging sequences; <br />Engineers Planners Architects Surveyors <br />