Laserfiche WebLink
3 <br />6. Revised Engineers Estimate of Probable Cost for several requested Phasing <br />Options for bidding purposes. <br />7. Revised Phased Construction costs for varying construction options. <br />Total Cost for Revised Engineering services as listed above ............................. <br />$ 32,000. <br />Construction Engineering/Inspection would be done on our standard hourly rates as <br />needed. <br />Revised Engineering of redesigned Parking /delivery area at Corporate Services: <br />1.) Revised Engineered Site Plan set detailing based on meetings with County & City: <br />a. Survey of Existing Conditions and Removals Plan. <br />b. Site Layout Plan with tabulated data. <br />c. Grading and Drainage Plan with storm water analysis /calculations. <br />d. Standard Specifications and Details <br />e. Landscape Plan. <br />f. Storm -water Retention Plan and /or Storm Sewer Connections and Details <br />as needed. <br />(10� g. Engineer's cost estimate of improvements. <br />Costfor a -f above ......................................... ............................... $ 8,550 <br />Revised Pedestrian walk connection plan from Mayflower Blvd. to Residential <br />homes to East of PUD site: <br />Revised Pedestrian connection Plans: <br />Revisions made to Pedestrian connection plans to match revisions made to Road plans for <br />both Mayflower Blvd. and Hutsfield Drive as requested. Theses revisions included design <br />changes to the integrated pedestrian path, landscape plans & material usage, plant <br />materials, amenity types and styles along with their proposed locations, light locations <br />and probable construction cost estimates. <br />Revised Construction Documents: <br />This included revisions to the drawing set based on changes requested after review and <br />approval from City. Revised bid ready, final construction drawings were provided for <br />bidding purposes to contractors. <br />Cost for Streetscape services listed above ............ ............................... $ 3,500 <br />The Project closeout total cost of this additional contract is $ 51,550 as detailed <br />(4 1 above. <br />