Laserfiche WebLink
G <br />Total Cost for Engineering services as listed above ............................. $ 17,500 <br />Construction Engineering /Inspection would be done on our standard hourly rates as <br />needed. <br />Engineering of redesigned Parking /delivery area at Corporate Services: <br />l.) Engineered Site Plan set detailing: <br />a. Survey of Existing Conditions and Removals Plan. <br />b. Site Layout Plan with tabulated data. <br />c. Grading and Drainage Plan with storm water analysis /calculations. <br />d. Standard Specifications and Details <br />e. Landscape Plan. <br />f. Storm -water Retention Plan and /or Storm Sewer Connections and Details <br />as needed. <br />g. Engineer's cost estimate of improvements. <br />Costfor a -f above ......................................... ............................... $ 7,350 <br />Pedestrian walk connection plan from Mayflower Blvd. to Residential homes to East <br />of PUB site: <br />Pedestrian connection Plans: <br />This will include the submission of conceptual design options to the City staff. The <br />conceptual drawings will address various components of the design including an <br />integrated pedestrian path, landscape plans & material usage, plant materials, amenity <br />types and styles along with their proposed locations, light locations and probable <br />construction cost estimates. The conceptual plans will be submitted to the City for review <br />and comment. We anticipate two additional meetings with the City staff to finalize the <br />conceptual design before moving to final design. <br />Construction Documents: <br />After review and approval from City staff, Danch Harper will provide bid ready; final <br />construction drawings that will include landscape plans, bio- retention planting plans, <br />details, specifications, and final construction cost estimates. <br />Cost for Streetscape services listed above ............ ............................... $ 4,000 <br />We anticipate that, given our current workload, we can prepare the construction plans <br />with sufficient detail for preliminary review within 4 -5 weeks of receiving your approval. <br />The Estimated Total Cost of this additional contract is S 33,600 as detailed above. <br />